Laserfiche WebLink
Clarifications <br /> <br />The following existing conditions were highlighted in the discussion as addressing some <br />of the neighborhood concerns but required no changes in language: <br /> <br />> #10. clarifies that current permit does not include approval for an expansion 0¢ <br /> existing pre-school and that such action would require a separate conditional use <br /> permit. [Note: The church Naster Plan includes no provision for any pre-school <br /> expansion. It is not in their plans at this time.] <br /> <br />> #26. provides for a landscaping maintenance agreement with the City <br /> <br />QUESTIONS/COMMENTS: <br /> <br /> The neighbors had the fo/lowing questions and comments regarding the revised plan: <br /> <br />O: Can the group of buildings be moved further south to allow even more space from <br />upper parking to fence? <br />A: Not possible for fire access and to do so would block light from an important <br />window in existing building. <br /> <br /> Q: What happened with the space required by MasoNs for their future storage area? <br /> A: 30 feet of space for said project have been maintained in the revised plan to allow <br /> for this option in the future. <br /> <br /> (~: What is the timing of the landscaping around the parking lot? <br /> A: Landscaping will be part of Phase 2 when parking lot is constructed (condition 66). <br /> <br /> Q: Will the labyrinth be placed exactly as shown on the plan? <br /> A: No, that is just a rendering. Details of that garden area will be worked out later <br /> (and will be subject to Design Review by Planning Commission - condition 65). <br /> <br /> Q: What about noise from the garden? <br /> A: It is intended as a meditative space and should not create a noise issue. <br /> <br /> Q: Does 3-phase approval lock in the size and layout of the spaces for all 3 phases? <br /> A: Yes. <br /> <br /> Q: Is the church happy with the revised plan for the worship space? <br /> A: Yes, very. <br /> <br /> Q: Can the proposed location of trash be moved? It is set to be placed behind the <br /> IVlason's sign. <br /> A: Yes. Location will be considered in phase 2 design. <br /> <br /> 2 <br /> <br /> <br />