My WebLink
|
Help
|
About
|
Sign Out
SR 05:244
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2005 3:09:01 PM
Creation date
9/2/2005 3:06:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:244
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
system in the design, construction, and operation of the proposed building, <br /> including all future tenant improvements. <br /> <br /> 18. The project developer shall effectively screen from view all ducts, meters, air <br /> conditioning equipment, and any other mechanical equipment, whether on the <br /> structure, on the ground, or on the roof, with materials architecturally <br /> compatible with the main structure. Screening details shall be shown on the <br /> plans submitted for issuance of building permits, the adequacy of which shall <br /> be determined by the Planning Director. All required screening shall be <br /> provided prior to occupancy. <br /> <br /> 19. All mechanical equipment shall be constructed in such a manner that noise <br /> emanating from it will not be perceptible beyond the property plane of the <br /> subject property. <br /> <br /> 20. The location of any pad mounted transformers or other utility equipment/ <br /> boxes shall be subject to approval by the Planning Di.rector prior to issuance of <br /> permits by the Building Department. Such transformers shall be screened by <br /> landscaping or contained within an enclosure matching the building and with <br /> corrugated metal gates. All transformers shall be shown on the plans <br /> submitted for issuance of building permits. The project developer shall attempt <br /> to locate transformers at the rear of the site. <br /> <br /> 21. The final building materials and colors for Phase I are subject to the review and <br /> approval by the Planning Director prior to the issuance of building permits. <br /> Any changes to the approved building materials and/or colors shall be <br /> submitted to the satisfaction of the Planning Director: <br /> <br /> 22. All backflow prevention devices installed with the development shall be <br /> painted forest green (Pantone Color System Number 2030) and shall be <br /> screened from view from public/private streets. Screens shall consist of <br /> berms, walls, or landscaping satisfactorily integrated into the landscape plan. <br /> Landscape screens shall include shrubbery designed by species and planting <br /> density to establish a complete screen within one year from the date of <br /> planting. Weather protection devices such as measures to protect pipes from <br /> freezing shall require approval by the Planning Director prior to use; at no time <br /> shall fabric or other material not designed and/or intended for this purpose be <br /> wrapped around or otherwise placed on these devices. All backflow <br /> prevention devices shall be shown on the plans submitted for issuance of <br /> building permits together with screening mechanism and/or weather protection <br /> devices. Proposed screening and weather protection devices shall be reviewed <br /> for conformity to these requirements and approved by the Planning Director <br /> prior to issuance of a building permit. <br /> <br />Case No. PCUP-118/PDR-391 City Council <br /> Page - 4 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.