My WebLink
|
Help
|
About
|
Sign Out
SR 05:244
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2005 3:09:01 PM
Creation date
9/2/2005 3:06:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:244
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fencin ocated around the pre-school area ............ v.-. ............. <br /> <br /> the landscaping and the ~c,l~d fence design are subject to the review and <br /> approval of the Planning Director. The fence and landscaping shall be <br /> installed as a part of the Phase [ developments. <br /> <br /> 13. All conditions of approval for this case shall be written by the project <br /> developer on all building permit plan check sets submitted for review and <br /> approval. These conditions of approval shall be on, at all times, all grading <br /> and construction plans kept on the project site. It is the responsibility of the <br /> building developer to ensure that the project contractor is aware of, and abides <br /> by, all conditions of approval. It is the responsibility of the building developer <br /> to ensure that the project landscape contractor is aware of, and adheres to, the <br /> approved landscape and irrigation plans. Prior approval from the Planning <br /> Department must be received before any changes are constituted in site design, <br /> grading, building design, building colors or materials, landscape material, etc. <br /> <br /> 14. Prior to issuance of a building permit for Phase I, the project developer shall <br /> pay the applicable Zone 72 .... City connection fees, and water meter cost for <br /> any water metersv including irrigation meters. Additionally, the project <br /> developer shall pay any applicable Dublin San Ramon Services District <br /> (DSRSD) sewer permit fee. <br /> <br /> 15. The project developer acknowledges that the City of Pleasanton does not <br /> guarantee the availability of sufficient sewer capacity to serve this <br /> development by the approval of this case, and that the project developer agrees <br /> and acknowledges that building permit approval may be withheld if sewer <br /> capacity is found by the City not to be available. <br /> <br /> 16. This approval does not guarantee the availability of sufficient water to serve <br /> the project. The City shall withhold building permits for the project if at the <br /> time building permits are applied for, mandatory water rationing is in effect, <br /> unless the City has adopted a water offset program and unless the project <br /> developer is participating in the program. Notwithstanding the project <br /> developer's participation in such a program, the City may withhold building <br /> permits if the City determines that sufficient water is not available at the time <br /> of application of building permits. <br /> <br /> 17. Prior to the issuance of a building permit for Phase I expansion, the project <br /> developer shall submit a LEED checklist and use their best efforts to <br /> implement the measures identified in the U.S. Green Building Council's <br /> (USGBC), "Leadership in Energy Environmental Design (LEEDtm)'' 2.0 rating <br /> <br />Case No. PCUP-118/PDR-391 City Council <br /> Page - 3 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.