My WebLink
|
Help
|
About
|
Sign Out
SR 05:241
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2005 11:45:51 AM
Creation date
9/1/2005 11:29:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:241
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fundraising eftbrt updates, and receive guidance and direction on how to <br /> proceed. <br /> <br />Honorable Mayor and Members of the City Council: <br />BACKGROUND <br /> <br />The Vision <br /> <br />The City's Downtown Specific Plan, adopted by the City Council in spring 2002, called for the <br />adaptive reuse of the former Fire Station located at 4444 Railroad Avenue as a facility which <br />could contain a small theater, art gallery, and classrooms. This recommendation reflected and <br />incorporated recommendations also contained in the Downtown Parks and Trails Master Plan, <br />and Arts Facilities Master Plan. <br /> <br />At its June, 2003 budget hearing, the City Council authorized the allocation of $6 million for the <br />master planning, design, and construction of the Firehouse Arts Center. The Pleasanton Cultural <br />Arts Council, in collaboration with the Tri-Valley Community Foundation, announced its <br />intention to undertake a significant fundraising campaign to provide additional monetary support <br />for the project. <br /> <br />Architectural Consultants <br /> <br />A Request for Proposals (RFP) was distributed to a number of architectural firms in the fall of <br />2003. The RFP's sought proposals for the master planning, creation of design and construction <br />drawings, and some construction-phase architectural services. An interview panel, including <br />representatives from the Civic Arts Commission, Parks and Recreation Commission, Pleasanton <br />Cultural Arts Council, Pleasanton Art League, Pleasanton Playhouse, Firehouse Fundraising <br />Committee, and relevant staff members interviewed four (4) finalists in December 2003. The <br />panel overwhelmingly recommended the firm of ELS Architecture and Urban Design of <br />Berkeley for the project. It cited the firm's focus on art gallery design, experience designing <br />very well known theater projects, and interactive method of engaging the panel in discussions <br />regarding its proposed approach to the master plan and design process. <br /> <br />The selection Committee's recommendation was reviewed and approved by the Civic Arts <br />Commission on January 5, 2004, and the Parks and Recreation Commission on February 12, <br />2004. <br /> <br /> Staff initiated discussions with ELS on a proposed Contract for consultant services in spring, <br /> 2004. The resultant Agreement provided for a comprehensive set of services, including <br /> confirmation of proposed programming for the facility; a structural analysis of the existing <br /> facility; development of conceptual and schematic plans of all facility elements, including <br /> <br /> SR 05:241 <br /> Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.