My WebLink
|
Help
|
About
|
Sign Out
SR 05:240
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 4:38:17 PM
Creation date
8/24/2005 4:39:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/30/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C <br />Assumed Street Widenings and Extensions <br />in Various Network Alternatives <br /> <br />The modifications to the "existing plus approved" street network (Alternative A) <br />undertaken in Alternatives B and C are widenings, extensions, and an interchange which <br />presently are a part of the City's Circulation Element. These streets are currently <br />partially built or unbuilt. They form the simplest starting point for reviewing alternatives <br />since all have long been a part of the City's traffic plans. <br /> <br />A full description of all street widenings was included in the January 11, 2005 workshop <br />staff report and is summarized here. A full description and discussion of the street <br />extensions and interchange is included in this Appendix. <br /> <br />Bemal Avenue Widenin~ <br /> <br />Bernal Avenue would be widened to four lanes on the following segments: <br /> --Foothill Road to 1-680 - portions are fully built, requires bridge widening <br /> beyond bridge currently designed and in C.I.P. <br /> --First Street to Independence - requires restriping only if bike lanes are <br /> removed/relocated. <br /> --Angela Street to Nevada Street requires restriping/removal of on-street <br /> parking and widening one lane northbound from Vineyard (N) to Tawny. <br />The Sunol to Vineyard segment attracts considerable future traffic, both local traffic and <br />regional cut-through. Note that the 2-lane segment from Independence to Angela <br />remains, creating a constraint on use of this route as a full-length by-pass of the First St. <br />corridor. Widening the segments here shifts some traffic from First and Main where <br />excess capacity does not exist. <br /> <br />Widening the Foothill - 1-680 segment was shown to have only a minor effect on traffic <br />switches. <br /> <br />Busch Road Widening <br /> <br />Busch Road would become a four-lane, divided roadway from Valley to E1 Charro. This <br />street will be fully widened from Valley to Ironwood Drive by the Ponderosa project on <br />Busch Ranch. The remainder is two lanes, partially private at the Hanson site. Right-of- <br />way and improvement would be completed as adjoining vacant/underdeveloped lands are <br />developed. <br /> <br />In both Alternatives B and C this street is heavily used by traffic seeking to use an El <br />Charro route either north or south in order to avoid the Stanley-Valley or 1-580 <br />congestion. Traffic is heavily worker trips, although regional cut-through traffic is <br />projected to use this street as well. Land uses to be developed on the Hanson and Kie- <br />Wit properties are linked to the rest of the City by this arterial and would be primary <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.