My WebLink
|
Help
|
About
|
Sign Out
SR 05:240
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 4:38:17 PM
Creation date
8/24/2005 4:39:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/30/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Restriping eastbound Dublin Canyon Road to provide a triple left turn and a through/right turn option <br />lane will provide LOS C and D conditions in the Year 2025. The 1996 General Plan assumed Foothill <br />Road would be widened to provide four northbound through lanes, but this would not provide LOS D or <br />better condition with current traffic model forecasts. <br /> <br />Another option is to eliminate the southbound left turn completely, and have this traffic instead turn left <br />at Deodar Way, which is a much less congested "T' intersection. This would provide LOS D or better <br />conditions at both intersections, and help reduce the existing weaving problem between the eastbound 1- <br />580 offramp and canyon Way. However, it is assumed that the mall and other businesses would oppose <br />this option. <br /> <br />Foothill Road at Castlewood Drive <br />Mitigation - Construct new speed sensitive traffic signal and westbound left turn pocket <br />In all Year 2025 scenarios, the traffic volume northbound and westbound exceeds that capacity of the <br />existing 4-way stop at this intersection. Constructing a traffic signal some time in the future would <br />significantly increase capacity at this intersection and reduce delay for nearby residents. Due to the <br />heavy westbound left turn volume, a short left turn pocket would need to be constructed between <br />Foothill Road and the bridge over Arroyo De La Laguna. <br /> <br />This is a gateway into the City and is used by existing and future cut-through traffic. But it is also along <br />one of the few routes residents in southwest Pleasanton have to access the rest of Pleasanton. It is <br />recommended that this intersection be included in the list of future traffic signals so that it can be <br />included in developer traffic impact fee calculations for construction at some future time. <br /> <br />Foothill Road at Deodar Way <br />Mitigation - Widen/restripe Foothill Road for 3 southbound lanes and eliminate the crosswalk crossing <br />Foothill Road <br />The 1996 General Plan assumes three lanes southbound on Foothill Road between I-580 and Stoneridge <br />Drive. The Year 2025 scenarios that include some of the 1996 General Plan road widenings assume <br />that there are three continuous southbound lanes on Foothill Road approaching this intersection. <br /> <br />There is an existing crosswalk at this intersection crossing Foothill Road on the south leg of the <br />intersection. There is no sidewalk, pedestrian path, but stop, housing or other destination a pedestrian <br />needs to access along the west side of Foothill Road near this intersection. However, the traffic signal <br />must be programmed to accommodate a pedestrian crossing Foothill Road as long as this crosswalk <br />exists. This pedestrian crossing time far exceeds the amount of green time needed by vehicles exiting <br />Deodar Way. This needlessly complicates coordinating this signal with the other signals along Foothill <br />Road, and takes green time away from other residents driving through the intersection. Removing the <br />crosswalk would reduce delay and improve signal coordination along Foothill Road. <br /> <br />Foothill Road at Highland Oaks Drive <br />Mitigation - Widen Foothill Road to 4 lanes <br />The 1996 General Plan includes the widening of Foothill Road to 4 lanes between Stoneridge Drive and <br />Muirwood Drive South. The Year 2025 scenarios that include some of the 1996 General Plan road <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.