My WebLink
|
Help
|
About
|
Sign Out
SR 05:240
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 4:38:17 PM
Creation date
8/24/2005 4:39:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/30/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br />Street Network Elements For Alternatives A, B and C <br /> <br />Existing Conditions - existing land use, traffic volumes, roadways, intersection lane and traffic <br />control configurations. <br /> <br />Year 2025 - Alternative A) Pleasanton intersection capacity enhancements - Existing + Aooroved <br />Pleasanton Land Development, plus regional 2025 development with buildout of the Livermore <br />and Dublin General Plans. <br />Over the next 20 years, this alternative assumes that the following regional network element will be <br />constructed: <br /> · An HOV lane on eastbound 1-580 from Santa Rita Road to Greenville Road. <br /> · Isabel at 1-580 Interchange <br /> · Isabel/Route 84 widening to 4 lanes from Pigeon Pass to Stanley, and 6 lanes from Stanley to 1- <br /> 580 <br /> · Dublin Boulevard extension to Livermore as 6-lane divided roadway with a 4-lane section <br /> through the unincorporated area. <br /> · Jack London extension to E1 Charro Road as a 4-lane roadway. <br /> · E1 Charro Road widening to 6 lanes from 1-580 to Jack London <br /> · East Dublin Properties roadway network <br /> · New Livermore General Plan roadway network including only 2 lanes on First Street through <br /> downtown. <br /> <br />Pleasanton Roadway network changes assumed over the next 20 years: <br /> · 23 New Traffic Signals at the following intersections: <br /> Bernal Avenue at 1-680 southbound ramps <br /> o Bernal Avenue at Kottinger Drive <br /> o Bernal Avenue at Main Street <br /> Bernal Avenue at Nevada Street <br /> o Busch Road at Ironwood Parkway <br /> o Foothill Road at Castlewood Drive <br /> o Hopyard Road at Del Valle Parkway (speed sensitive) <br /> Santa Rita Road at Francisco Street <br /> o Stoneridge Mall Road at Deodar Way <br /> o Stoneridge Mall Road at Embarcadero Court <br /> o Sunol Boulevard at Castlewood Drive <br /> o Sunol Boulevard at 1-680 northbound <br /> o Sunol Boulevard at 1-680 southbound <br /> © Valley Avenue at Blackbird Drive <br /> o Valley Avenue at Boulder Street <br /> o Valley Avenue at Case/Junipero <br /> Valley Avenue at Crestline Road <br /> o Valley Avenue at Hansen Drive <br /> Valley Avenue at Koll Center south <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.