My WebLink
|
Help
|
About
|
Sign Out
SR 05:239
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2005 12:20:13 PM
Creation date
8/18/2005 11:54:26 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/23/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:239
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> <br /> City Council Priorities <br /> Adopted April 19, 2005 <br /> <br /> Goals Project Description <br /> <br />TRAFFIC <br />Implement Improved Traffic Circulation Measures <br />Th-Valley Triangle Traffic Study The study looks at regional transportation projects included within the 1580 1680 <br /> Route 84 triangle. The study analyzes needs and priorities of regional projects <br /> in the area of the study. <br />Traffic Signal Coordination This is an ongoing project to continuously look at ways to improve the flow of <br /> traffic through the City. This could include new traffic signaling schemes <br /> developed or traffic calming opportunities which enable the motorist to travel a <br /> thoroughfare street with a minimum of delay or traffic. Some policy issues will <br /> be addressed through the General Plan update. <br /> <br />Traffic Committee Awareness and Outreach Bring more awareness and oversight to Traffic Committee to help address <br /> traffic issues in Pleasanton. <br />CALLIPPE GOLF COURSE AND HAPPY VALLEY OPEN SPACE <br />Complete the Callipbe Golf Course, including a Solution to the Bypass Road <br />Complete Development and Construction of Golf Course The project is under construction and is expected to be completed in June/July <br /> 2005 with play to begin in late December 2005. <br />Evaluate Reorientation of Driving Range Determine feasibility and evaluate cost of relocation. <br /> <br /> Happy Valley Bypass Road Development The issue of the Bypass Road has changed with Greenbriar's application for <br /> development of the Spotomo property, including a different alignment for the <br /> Bypass Road. Bypass Road alternatives will be studied as part of the <br /> modification to the Happy Valley Specific Plan which is necessary for <br /> Greenbriar*s proposal <br /> <br />ECONOMIC DEVELOPMENT <br />Pursue Economic Vitality, Including the Recruitment and Retention of Quality Businesses <br /> Marketing campaign to promote/support local business Coordinate with local business organizations and Chamber to develop a <br /> campaign to encourage support and patronage of local businesses. <br /> <br /> Develop Business Attraction Program Develop both online and hard-copy collateral pieces to aid in personal contact <br /> to encourage new businesses to locate in Pleasanton. Explore incentive <br /> programs that would promote attraction. <br /> <br />YOUTH PROGRAMS <br />Strengthen Youth Programs, Services and Activities <br />Youth Master Plan Implementation This is a multi-faceted approach to providing services to youth. Website <br /> (ptown411 .corn), Youth Center Master Plan process and BMX Park <br /> development are examples of projects currently underway. City would continue <br /> to provide staff support to this effort to enable implementation of the YMP. <br /> <br />PUBLIC SAFETY <br />Provide a Safe Environment for the People and Property In Pleasanton <br />Police/Youth Relations Continue to implement *q'he Parent Project" to assist families with troubled <br /> teens. <br />Maintain the City Emeq~ency Preparedness Plan Coordinate plan updates, facilitate year round staff training and conduct at least <br /> one drill annually. <br />Public Safety Awareness Programs - Enhance and Encourage Reestablish a strong Crime Prevention message to discourage c~me; reaffirm <br /> Crime Prevention techniques; establish an "Anonymous Tip Line" to help solve <br /> crimes. <br /> <br /> Complete and open relocated Fire Station #4 on the Bernal Property Staff will coordinate construction supervision and facilitate the move-in by mid- <br /> summer 2005. <br /> <br /> QUALITY OF LIFE <br /> Provide Programs and Services that Enhance the Quality of Life for Pleasanton Residents <br /> Library, Youth Center, Community Center, and Civic Center Master Plan These four separate projects will be reviewed collectively initially to determine <br /> Process there impact on the civic center site and the Council's direction related to <br /> coordination of these activities. <br /> <br /> Second Bemal Bridge crossing Arroyo De la Laguna Project builds a second bridge adjacent to the historic steel bridge. The bridge <br /> provides left turn access into the Windsor development. <br /> First Street Renovation Coordinate with PG&E on First Street renovations to facilitate completion by <br /> December 2006. <br /> <br /> Page 2 of 4 <br /> 8/I 6/2005 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.