Laserfiche WebLink
Phase III - In Phase III of the Master Plan, the Administration Building <br />would be built in the area north of the current existing building. Site <br />improvements will include landscaping and concrete walkways. The <br />parking constructed in Phase II will service the Phase III addition. <br /> <br />Fire Access: Fire access is provided to all buildings from the north and <br />south parking lots via the entrance on South Valley Trails Road with a <br />Fire lane connecting the two parking area's. To enable the fire trucks to <br />make a 180 degree turn on site, a Harmnerhead layout will be provided. <br />The parking lot drive aisles, turning radii, Hammerhead and other <br />configurations have been designed in accordance with Livermore- <br />Pleasanton Fire Department standards. The parking layout has been <br />reviewed by the Fire Department and found to be appropriate for their <br />requirements. Two fire hydrants will be placed on site as directed by the <br />Fire Marshall. <br /> <br />Construction Staging: Initial improvements for Phase II would develop <br />the new north parking lot and grade the pad area for the Worship Facility. <br />The south parking area would remain open for weekday and weekend <br />Church and Mason use until the north parking lot is complete. The south <br />parking area will then be utilized for the construction materials yard and <br />staging. <br /> <br />Phase III staging would utilize a small portion of the north parking area, <br />and area adjacent National Park Drive; the north parking area would <br />remain open and accessible to the Church and Masons during <br />construction. <br /> <br />Lighting: Lighting will be provided throughout the parking areas for <br />security and safety at a maximum 1 footcandle/s.f. The lighting will be <br />maximum 25-foot pole mounted lights, with shielded reflectors to direct <br />light out and downward away from property lines and neighboring <br />properties. The perimeter of the buildings will have downlights or <br />landscape uplights for building accent. Low-level bollard lights will be <br />placed along pedestrian paths. <br /> <br />Landscaping: Landscaping will be provided around each building and <br />parking areas at each phase of the development. The landscape plan <br />provides a palette of plant materials to provide a coordinated campus feel <br />at the completion of build-out. <br /> <br />Trash: A new trash enclosure would be built with development of Phase <br />II. The trash enclosure would be located in the north-east comer of the <br />existing south parking lot and would be structured to comply with current <br />local and State requirements for masonry enclosure, steel gates, overhead <br />coveting and internal drainage. <br /> <br /> Page 4 <br /> <br /> <br />