Laserfiche WebLink
d. Create a contained and covered area on the site tbr the storage of bags, <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain <br /> system through being windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> <br /> f. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into street, gutters, or storm drains. <br /> <br />Case No. PCUP-118/PDR-391 City Council <br /> Page - 11 - <br /> <br /> <br />