My WebLink
|
Help
|
About
|
Sign Out
SR 05:202
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2005 10:08:49 AM
Creation date
7/14/2005 9:44:20 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:202
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />The Longview Drive Water Line Project was identified in the City's 2003 Water Master Plan <br />update for furnishing hydraulic improvements to the City's water distribution system west of <br />Foothill Road. The new 12" water line will run parallel to the existing 8" line at the discharge <br />side of the pump station. Also, the City of Pleasanton's Sewer Department has identified <br />sewer facilities on Amaral Circle, Old Bernal Avenue, Bernal Court, Bonita Avenue, Mirador <br />Drive, Gale Avenue, Whiting Avenue, Nevis Street, and Adams Way that are in need of <br />replacement. Recommendations were made to replace, repair and/or upgrade the existing <br />sewer facilities that serve these areas. <br /> <br />CONSULTANT FIRM SELECTION PROCEDURE <br /> <br />A Request for Proposal (RFP) was sent to a total of ten consultant fa-ms. The £n'ms were <br />either from the City's qualified list of consultants, or firms that had expressed an interest in <br />receiving a copy of the RFP. Four firms from the qualified list responded with proposals. <br />Each of the respondents has provided consultant services to the City within the last two years. <br />After discussions with the review committee, which included representatives from the various <br />departments affected by the work, one fn'm was found to be best suited to provide the services <br />requested. Based on the review of proposals and discussions with the committee members, <br />Pakpour Consulting Group, Inc. was selected to provide the services needed. <br /> <br /> CONTRACT <br /> <br /> The proposed contract with Pakpour Consulting Group, Inc. is included along with the <br /> corresponding Exhibit "A", Scope of Work, and Exhibit "B", Fee Schedule. The not-to- <br /> exceed cost of the contract is in the amount of $163,360. <br /> <br /> BUDGET <br /> <br /> The cost for this work will be drawn from the funds allocated for this project appropriated <br /> from thc Parallel Longview Pump Station Discharge Line and the Annual Sewer Replacement <br /> Fund. <br /> <br /> SR:05:202 <br /> Page 2 of 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.