Laserfiche WebLink
<br />Resolution No. PC-94-32 <br />Page 7 <br /> <br />18. The applicant shall include erosion control measures on the <br />final grading plan, subject to the approval of the City <br />Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes <br />shall be revegetated and stabilized as soon as possible after <br />completion of grading, in no case later than October 15. No <br />grading shall occur between October 15 and April 15 unless ap- <br />proved erosion control measures are in place, subject to the <br />approval of the City Engineer. Such measures shall be <br />maintained until such time as permanent landscaping is in <br />place. The applicant shall provide temporary irrigation as <br />necessary to ensure that the hydroseeded grasses are <br />established before October 15. <br /> <br />{end} <br /> <br />II <br /> <br />I] <br />