Laserfiche WebLink
shall require the following measures to be implemented with the <br /> construction of the structures covered: <br /> 1) Electrical conduit and cable shall be installed from the <br /> roof/attic area to the buildings' main electrical panels. <br /> <br /> 2) Roof trusses shall be engineered to handle an addition load of <br /> five (5) pounds per square foot beyond that of the anticipated <br /> load for the roofing material. <br /> <br /> 3) An area shall be provided near the electrical panel for the <br /> "inverter" required to convert the direct current output from the <br /> photovoltaic panels to alternating current. <br /> <br /> 4) A bi-directional electrical meter shall be installed. <br /> <br /> These measures shall be shown on the building permit plan set <br /> submitted to the Planning Director for review and approval before <br /> issuance of the first building permit. The project developer shall <br /> provide the future homeowners the necessary information delineating <br /> the means by which photovoltaic panels can be applied to the roofs of <br /> the structures covered by this approval. This information shall be <br /> submitted tot the Planning Director for review and approval prior to <br /> the occupancy of the fin:st unit. <br /> <br />{end} <br /> <br /> 12 <br /> <br /> <br />