My WebLink
|
Help
|
About
|
Sign Out
SR 05:168
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2005 9:12:41 AM
Creation date
6/16/2005 9:10:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:168
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VI. CONCLUSION <br /> <br />This CIP presents a wide range of street, parks, utility and public facility projects that will address many <br />community interests and needs. However, the City is currently involved with significant planning <br />activities that will potentially place a heavy emphasis on prioritizing, scheduling and funding a range of <br />new projects that will impact future CIP's and the City Operating Budget. As an example, a listing of <br />major projects currently being studied, planned, or designed include the following: <br /> <br />· Acquisition of Additional Downtown Parking <br />· Additional Lighted Sports Fields <br />· Alviso Community Park Construction <br /> Aquatic Center Expansion and Renovation <br />· Bemal Property Grand Meadow Construction <br />· Civic Center Master Plan <br />· Cultural Arts Complex <br />· Firehouse Arts Center Construction <br />· Library Expansion or Construction of a New Library <br />· Outdoor Amphitheater <br />· Youth/Community Center Construction <br />· Veteran's Memorial Building Remodel <br /> <br />This list will ultimately be augmented with the major street, utility and major remodeling and <br />maintenance projects for existing facilities, such as the Gingerbread Preschool and Amador Theater, that <br />will need to be addressed as the City strives to meet community expectations. In addition, with the <br />exception of new cultural arts facilities, the facilities listed above will not generate any significant <br />revenue needed to address the operations of these facilities unless the Council adopts new cost recovery <br />policies that deviate significantly from current practice. <br /> <br />Many of the facilities listed above developed quite recently primarily out of the acquisition of the Bemal <br />Property and in an attempt to address community interests. While the development of these facilities <br />represents an exciting challenge for the community, previous financial planning efforts designed to meet <br />long term community CIP needs did not anticipate many of these improvements, and as a result, <br />financial planning tools put in place previously will provide only limited funding that will be inadequate <br />to fully fund these projects. <br /> <br />While staff and previous Councils have taken a conservative approach in developing and financing this <br />and previous CIP's, this approach may not be ideal for future CIP's which may require new revenue <br />sources, including potentially the issuance of general obligation bonds, to fully finance these projects. As <br />a result, staff anticipates that additional financial analysis and an increased emphasis in developing <br />priorities and phasing of facility improvements will be necessary as we move from the concept phases to <br />the planning phases for these facilities. <br /> <br />Staff is confident that this plan addresses the City's current capital improvement requirements and <br />through the collective efforts of the Council and the community, these future challenges will be met in a <br />way that maintains the high quality of existing streets, facility and utility infrastructure and allows for the <br />development of new facilities in a cost efficient and effective manner. <br /> <br />xxii <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.