Laserfiche WebLink
Grants <br /> <br />Grant and loans from state and federal agencies continue to play an important role in funding City <br />programs and services, and this CIP includes $40,000 in 2006-07 from a Transportation Development <br />Act grant for constructing accessible ramps. Based on experience, additional grant funding may become <br />available as staff continues to pursue a range of project funding opportunities. <br /> <br />Utility User's Fees <br /> <br />The City has historically adjusted sewer and water rates to assure adequate funding for Sewer and Water <br />replacement and improvement projects. To show the availability of Sewer and Water replacement funds, <br />the water and sewer program is divided into expansion and replacement/improvement projects. <br />Expansion projects are those funded by connection fees for development activities while replacement <br />and improvement projects are funded by utility user fees that are transferred from the water and sewer <br />maintenance and operation funds to the CIP for replacement/improvement projects, including debt <br />service. The funds are not transferable between each other. Although from time to time, loans may <br />occur between these funds to meet immediate project needs. All water and sewer detail is included in <br />Section I of the Appendix. Revenue from the water and sewer maintenance and operation fund is as <br />follows: <br /> <br />SUMMARY OF UTILITY USER FEES INCLUDED IN THE CIP <br /> <br /> FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 TOTAL <br />WATER $2,335,137 $2,423,173 $2,321,173 $2,422,059 $9,501,524 <br />IEWER $1,441,157 $1,434,240 $1,536,651 $1,542,693 $5,954,741 <br />rOTAL $3,776,294 $3,857,413 $3,857,824 $3,964,752 $15,456,283 <br /> <br />Transfers from the General Fund <br /> <br />This CIP includes a transfer of $5,000,000 from the General Fund in each year of the CIP for a total of <br />$20 million. This funding is used for projects in the Streets, Parks and Miscellaneous programs <br />including the Civic Center Site Improvement Reserve, debt service, Kottinger Creek Restoration, Bemal <br />Creek Restoration, Bemal Property Improvements, Expansion of the Aquatic Center and Annual Street <br />Resurfacing. With the exception of 2005-06, annual funding is allocated $1 million to Streets, $2 million <br />Parks and $2 million Miscellaneous. For 2005-06, Miscellaneous is allocated $3 million to <br />accommodate an $800,000 allocation to the Kottinger Creek Restoration project, the Citywide Survey <br />Monument Benchmarking and the Soundwall Replacement at the South Side of Stoneridge Drive <br />project. General Funds are not allocated to Streets in 2005-06 reflecting the availability of an existing <br />beginning balance of $1.5 million in the Streets program. <br /> <br />Since beginning these transfers in FY1998, the General Fund's contribution has been divided into <br />two components. The first component is an annual ongoing contribution intended to remain <br />somewhat constant through build-out. The goal of this component is to eventually create a stable <br />contribution of approximately $5 million annually. The initial annual contribution from this <br /> <br />xii <br /> <br /> <br />