Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Adjusted Budget <br /> <br />oo5oll Foothill Road Widening at Dublin Canyon Road 0 0 0 0 0 0 998~000 0 998,000 <br />0o5014 1-580 Corridor Management/Signals, Phase I1 0 0 I 0 0 0 0 0 0 0 <br /> Second Street Reconstruction: Kottinger to Neal Street and portions of <br />oosols Ko'ainl~er 703,746 0 0 0 0 0 9,897 0 713,643 <br />005o17 1-580 Colridor ManagementJSi~als, Phase l 194,849 0 0 0 0 (12~463) 0 0 182,386 <br />oo5o24 Hopyard Road and Owens Drive Widening Phase Il 0 0 0 0 0 0 0 i 96~762 96,762 <br />eo5o29 Bemal Avenue Widening from Vineyard to Arroyo Del Valle 102,364 149,522 44,002 258,074 0 0 784,117 0 1,338,079 <br />oo5030 Del Valle Parkway: Ext from First Str to California Ave (Addl Funding) 223,960 0 0 256,040 0 0 0 0 480,000 <br />oo5o68 Bemal/l-680 Interchange 0 0 0 0 668,372 0 217,581 0 885,953 <br />o05o69 West Las Positas Resurfacing: T~ssajara Creek/Hacienda 0 40,700 0 0 0 950,517 0 0 991,217 <br />Ol 5o31 Pleasanton Avenue Reconstruction from Rose Avenue to Division Street 40,000 0 275,000 0 0 0 0 0 315,000 <br />o15032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW 49,064 0 0 0 0 0 0 0 49,064 <br />o15033 Stoneridge Drive Roadway Landscaping 0 0 0 0 0 0 0 0 0 <br />ol5o34 Up~'ade Traffic SiNai Services 0 0 ' 0 0 0 0 0 0 0 <br />o~5041 Tri-Valley Transportation Development Fee Reserve 0 0 0 721,599 0 0 0 0 721,599 <br />o15o67 1580/El Cbarro lntarchange Study 0 0 0 0 0 0 0 0 0 <br />m$o6s Street Lightin[~ Upgrades 113,475 51,956 9,115 0 0 0 0 0 174,546 <br />o25oo3 Annual Resurfacinl~ of Various Streets (~54,210) 154,210 0 0 0 0 0 0 0 <br />o25oo7 Annual Traffic Buttons and Line Markers Installation 0 0 0 0 0 0 0 0 0 <br />025014 Vineyard Corridor Infrastructure hnprovements Phase l 834,467 0 I 0 0 0 0 67,000 0 901~467 <br />025o15 Sunol B[vd at 1-680 South Bound Off Ramp: Install New Traffic Signal 35,699 0 I 0 247,483 0 0 0 0 283,182 <br />o25ol6 Sunol Blvd Reconstraction (or Widening): Junipero to I~680 Phase I 0 0 0 0 0 0 0 0 0 <br />o25o~9 Foothill at Muirwood Dr. South: Street AlignmentNew Traffic Signal 20~000 0 45,801 0 0 97,000 6,000 0 168,801 <br /> Vineyard Corridor Infrastructure Improvements Phase l - Joint City PUSD <br />o25o22 ~scrow Fund 0 0 0 0 0 0 0 0 0 <br />o25o23 Dougher~ Valley Mitigation Revenue Reserve 407,650 0 0 0 0 0 0 0 407,650 <br />o25o3o Foothill Road Improvements, South of Oak Creek Drive 6,000 0 44,000 0 0 0 0 0 50,000 <br />025039 Traffic Signal at Pleasanton Ave and Bemal 0 0 0 7z234 0 0 0 0 7,234 <br />o25040 Traffic Signal at West Las Positas and Dorman 0 0 0 (6,712/ 0 0 0 0 (6,712) <br />o25o41 Traffic Signal at Vineyard and Montevino 0 0 0 0 0 0 0 0 0 <br />o25o42 Bemal St Improvements at Valley 0 0 0 0 0 0 0 0 0 <br />o25071 First and Kortinl~er Under,rounding for Street Li[[hts and Laterals 876,810 0 0 0 0 0 0 0 876,810 <br />o35o~3 Annual Resurfacing of Various Streets 155,233 1,277,720 385,652 6,835 0 0 0 0 1,825,440 <br />o35oo4 Annual Slurt~ Sealin~ of Various Streets 20,000 20,000 100~000 0 0 0 0 0 140,000 <br />o35oo5 Annual Sidewalk and Intersection Ramp Installations 0 0 0 0 0 0 0 0 0 <br />o35oo6 Happy Valley Bypass Road 500,000 0 0 0 0 0 500,000 0 1,000,000 <br />035o07 Annual Traffic Bu~ons and Line Markers Installation 0 0 0 0 0 0 0 0 0 <br />o35co9 Annual Curb and Gutter Replacements for Street Resurfacin~ Projects 147,353 0 0 0 0 0 0 0 147,353 <br />o35ol2 Annual Sidewalk Maintenance 14,304 0 0 0 0 0 0 i 0 14,304 <br /> Hacienda Drive ~ Owens Drive: Reconfigure Intersection and Upgrade <br />035o20 Traffic Signal 76,000 0 0 0 0 0 0 0 76,000 <br />035021 Evaluation and Reclassification of Street Surfaces 25,297 0 0 0 0 0 0 0 25,297 <br /> <br /> SR 05_166 Streets CIP Adjusted BudgeLxls 8-6 6/I 3/2005 11232 AM <br /> <br /> <br />