My WebLink
|
Help
|
About
|
Sign Out
SR 05:166
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2005 9:13:08 AM
Creation date
6/16/2005 9:04:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Quarter 2 <br /> Sunol Blvd. Reconstruction (or Widening): Junipero to 1-680 Phase I1 <br />o35ca2 (Reseive) (193,920', (306,080) (500,000) <br />035055 Neighborhood Traffic Calming Devices (44,044'~ (44,044 <br />045oo3 Annual Resuffacing of Various Sweets {563,79[ (75,214/ 639,012 0 <br />o45oo4 Annual Slurt7 Sealinl~ of Various Stseets 0 <br />0450o5 Annual Sidewalk and Intersection Ramp Installations (11,569) (11,569) <br />o450o7 Annual Traffic Buttons and Line Markers Installation 8,177 103,559 111,736 <br />o45o0o Annual Curb and Gutter Replacements for Street Resurfacing Projects 0 <br />045012 Annual Sidewalk Maintenance 10,914 10,914 <br />o45018 BemaI-Meadowlark Drive Street Improvements 0 <br /> Replacement of Damaged Sidewalk and Curb and Gutter in the Val Vista <br />o45o~9 Nal~aborhood &499 &499 <br />o45054 Installation of New Traffic Signals at Various Locations (31,000) (215,000) (246,000) <br />oasoss Neighborhood Traffic Calming Devices 44~044 44~044 <br />055oo6 Signal - Bernal ~ Fire Station 4 80,000 120,000 200,000 <br />soooo3 North Sycamore Specific Plan Reimbursement 0 <br />$0oOl4 Stoneridge Dr Specific Plan Study 0 <br />8050o8 Signal - Main ~ Vervais - Reimburse Developer (2031 (203) <br />so5o~4 Right of Way Transfer to Calttans (NP[D3) 0 <br />8o5o15 Tr alTlc Signal at Beraal & Tawny 10~099 10,099 <br />8o5016 Vineyard Ave. Specific Plan 1,393.694 1,393,694 <br />8o5o17 Traffic Si[~nal Equipment- TR 7381 Ponderosa 129.715 129,715 <br />8o5o19 TriValley Triangle Traffic Study 58,000 58,000 <br />935030 Extension of Livingston Way 0 <br />935045 AI'fOyO de la Lacuna Imp: Removal of old Bernal Brid[~e Foundation 0 <br />955029 First St Bridge at Arro~,o Del Valle; lnterim Improve (ISTEA/HBRR) 0 <br />975038 Owens Drive Improvements - Phase I (5 lz488) (51,488) <br />975039 Santa Rita at Valley Intersection Improvements (NPIDg I ) 0 <br />975062 Owens Drive Improvements - Phase Il 51,488 51,488 <br />985013 Storm Drainage Improvements on Foothill Rd South of Bemal Ave 0 <br />085m6 Dublin Canyon Road Widening 0 <br />985033 Street Light - Pole Replacement Pro,-am ( 100,00( (30,00( (130,000) <br />955090 Dublin Reimbursement for Futore Projects 0 <br />905019 Foothill Rd Widening (East Side) Bemal to Foothill PI (Addl Fundin[) 0 <br />995o20 Stoneridge Mall Rd Sidewalk & Construction - Canyon to Embarcadero 0 <br />o95028 Sutter Gate and Mohr Avenue: Resurface Intersection 0 <br />99503 t Stanley Blvd. Widenin[~ at Valley/Bemal 5,922 5, 922 <br />995066 Dublin Canyon Road Bridge Replacement (Additional Funding) 0 <br />9o5o67 Bemal Avenue at Arroyo Del Valle (Construct Second Bridge) 0 <br />~o999 interchanges Landscape Maintenance (NPID3) 18,000 18,000 <br />999999 To General Fund - Congestion Management 0 <br />~m999 To General Fund for Administration 0 <br /> <br /> SR 05_166 Streets CIP Adjusted Budget xls B-3 6/I 3/2005 11:32 AM <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.