My WebLink
|
Help
|
About
|
Sign Out
SR 05:166
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2005 9:13:08 AM
Creation date
6/16/2005 9:04:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Quarter 2 <br />oo5oll Foothill Road Widening at Dublin Canyon Road 0 <br />oo5Ol4 1-580 Corridor ManagemenffSi~nals, Phase Il 0 <br /> Second Street Reconstraction: Kottinger to Neal Street and portions of <br /> <br />oo~017 1-580 Corridor Management/Signals, Phase I 499,833 (9,179) (400, 759) 89,895 <br />~o~02z4 HoDyard Road and Owens Drive Widening Phase Il 0 <br />005029 Bemal Avenue Widening from Vineyard to Arroyo Del Valle 0 <br />ooso3o Del Valle Parkway: Ext from First Str to California Ave (Addl Funding) 0 <br />005o~8 Bemal/l-680 lntorchange (61.919) (61.9191 <br />oo5o~9 West Las Positas Resurfacing: Tassajara Creek/Hacienda (55,0001 (55,000 <br />015032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW 0 <br />o15o33 Stoneridge Drive Roadway Landscaping 0 <br />o15o3n Upgrade Traffic Signal Services {17,278) (17,278) <br />o15o41 Tri-Valley Transportation Development Fee Reserve 0 <br />m5o67 1580/EI Cha~ro Interchange Study 0 <br />o15o6* Street Lighting Upgmdas 100,000 30,000 130,000 <br />o25oo3 Annual Resurfacing of Various Streets {154,210) 154,210 0 <br />o~5oo? Annual Traffic Buttons and Line Markers Installation (8.177) (3z5581 (11,735) <br />025014 Vineyard Corridor In frastmctore Improvements Phase 1 8,118 8,118 <br />025015 Sunol Bird at 1~580 South Bound OffRamp: Install New Traffic Signal 11,961 219,867 231,828 <br />025016 Sunol Blvd Reconstrac6on (or Widening): Junipero to 1-680 Phase I 0 <br />o2501o Foothill at Muirwood Dr. South: Street Ali~nmentNew Traffic Signal (120,000) (120,000) <br /> Vineyard Corridor lnfrostructure Improvements Phase I - Joint City PUSD <br />025023 Deu~hert}~ Valley Mitigation Revenue Reserve (S&O00) (58,000) <br />o25o3o Foothill Road Improvements. South of Oak Creek Drive 0 <br />o25o39 Traffic Signal at Pleasanton Ave and Bemal 7,234 7,234 <br />o2504o Traffic Signal at West Las Positas and Dorman (17,445~ (17,445) <br />o25o41 Traffic Signal at Vineyard and Montevino (11,960~ <br />025o42 Bemal St Improvements at Valley (8,450) (1,2181 (9,668) <br />o25o71 First and Kottinger Underl~rounding for Street Lights and Laterals 426,113 426.113 <br />035co3 Annual Resurfacing of Various Streets (516,915) (119,737) 385,652 (251,000) <br />o35oo4 Annual Sluny Sealing of Various Streets 20,000 20,000 <br />o35oo$ Annual Sidewalk and Intersection Ramp Installations <br />m5oo6 Happy Valley Bypass Road 0 <br />035007 Annual Traffic Buttons and Line Markers Installation ( 100,000) (I 00,000] <br />o~5oo9 Annual Curb and Gutter Replacements for Street Resurfacing Projects 0 <br />o35ol2 Annual Sidewalk Maintenance 7, 767 7, 767 <br /> Hacienda Drive ~ Owens Drive: Reconfigure intersection and Upgrade <br />035020 Traffic Signal (49,000) (49,000~ <br /> <br /> SR 05_166 Streets C1P AdJusted Budget xls B-2 6/1312005 I 1:32 AM <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.