My WebLink
|
Help
|
About
|
Sign Out
SR 05:175
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2005 2:38:45 PM
Creation date
6/15/2005 2:22:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:175
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br /> <br />pL£AS/kNTON <br /> <br />6P <br /> <br />City Council <br />Staff Report <br /> <br /> June 21, 2005 <br />Public Works Department <br /> <br />SUBJECT: <br /> <br />AMENDMENT TO THE DESIGN CONTRACT WITH RUGGERI, <br />JENSEN, AZAR AND ASSOCIATES (RJA) FOR THE VINEYARD <br />CORRIDOR WATER RESERVOIR ACCESS ROAD <br /> <br />STAFF RECOMMENDATION: <br /> <br /> Staff recommends that the City Council take the following action at the <br /> meeting of June 21, 2005: <br /> <br /> 1. Approve the attached professional services contract amendment. <br /> <br /> 2. Authorize the City Manager to execute the attached contract <br /> Amendmem with Ruggeri, Jensen, Azar and Associates (RJA). <br /> <br />SUMMARY: Amendment No. 1 of the Ruggeri, Jensen, Azar and Associates (RJA) <br /> professional services contract, in the amount of $36,480.00, provides for <br /> supplemental geotechnical work and the design of the joint utility trench <br /> (electrical, telephone and gas) associated with the design of the Vineyard <br /> Corridor water reservoir and access road. <br /> <br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />The Vineyard Corridor water reservoir and the water main and access road to the reservoir <br />are included in the second stage of the Phase 3 Vineyard Corridor Water Improvements. The <br />water reservoir and access road is located at the south side of Vineyard Avenue on the <br />Reznick Property. The first stage of these Phase 3 improvements includes a new water pump <br />station and the modification of the Zone 7 Turnout Number 6. These other improvements are <br />located on or adjacent to Fire Station 5 on Vineyard Avenue. These water improvements are <br />designed to serve the entire Vineyard Corridor Specific Plan area. <br /> <br />SR:05:175 <br />Page 1 of 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.