Laserfiche WebLink
<br />Who Verifies: Planning Department. <br /> <br />Historic and Archaeoloaic Resources <br /> <br />2l. Protect prehistoric resources (page l06). <br /> <br />Who: <br />What: <br /> <br />Individual developers and contractors. <br />Personnel involved in ground clearing shall be <br />alerted to the potential of the discovery of <br />prehistoric materials. Indicators of potential <br />finds include, but are not limited to the <br />following: soils darker than the surrounding soils, <br />amounts of bone or shellfish mixed in the soils, <br />any signs of fire (ash, charcoal, baked clay, <br />carbon or fire altered rock), any identifiable <br />artifacts of stone, bone or shellfish, and any <br />burials. <br />Instruction shall be given to stop work in the <br />event of a discovery until a qualified <br />archaeologist has inspected the find and has <br />developed recommendations for its evaluation and <br />specific mitigation under current CEQA guidelines. <br />Prior to initiating ground clearing andlor grading. <br />Public Works and Building Inspection Departments. <br /> <br />When: <br />Who Verifies: <br /> <br />22. Protect historic resources (page l06). <br /> <br />Who: <br />What: <br /> <br />Developer of Parcel 18. <br />Conduct archival research on age, use and location <br />of existing and removed structures, wells, privy <br />pits or dumps which may contain historic debris. <br />Identify previous owners and use pattern of the <br />property. <br />Prior to tentative map approval, ground clearing, <br />demolition permit issuance, and grading permit <br />issuance. <br />Planning Department. <br /> <br />When: <br /> <br />Who Verifies: <br /> <br />Soils and Geoloav <br /> <br />23. Submit geotechnical investigations on Parcels l8, 22, 23, 24 <br />and 25 (page 100 of FEIR). <br /> <br />Who: <br />What: <br /> <br />Individual developers. <br />CondUct detailed fault investigations to determine <br />the location of earthquake faults within these <br />parcels in compliance with the Alquist-Priolo Act, <br />following consultation with the City'S consulting <br />geologist as to appropriate methodology. <br />Engineering and design mitigation measures <br /> <br />- 7 - <br />