My WebLink
|
Help
|
About
|
Sign Out
SR 05:160
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2005 2:12:45 PM
Creation date
6/15/2005 1:56:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />MAY 25,2004 <br /> <br />A. SCOPE OF WORK <br /> <br />We would also ask GEl to provide demolition coring so that our <br />demolition plan would identify pavement thickness for construction. <br /> <br />2.1.4. Preliminary Landscape Surveys - Consultant will provide a basic <br /> site investigation and evaluation of existing landscape conditions <br /> and report their suitability with respect to protection or removal. <br /> Included with this investigation is the identification of any existing <br /> trees requiring removal or protection. <br /> <br />2.2. Office Mapping - The aerial topography map combined with the field <br /> survey information will serve as the Project Topographic Base Map. Basis <br /> of Bearing and Benchmark will be included on the Survey. <br /> <br />CONSULTANT will distribute project base mapping to all design team <br />members and make accessible readily upon each design stage. This <br />topographic base map will be the uniform "x-reference" for all design <br />work. Topographic base mapping will be updated for all CONSULTANT <br />Team members at the beginning of each design phase. <br /> <br />2.3. Utility Coordination & Mapping <br /> <br />2.3.1. <br /> <br />USA Markings - The pavement corings required for the <br />Geotechnical Report will have additional value, they will cause USA <br />markings in the street. USA markings are extremely valuable <br />information for utility mapping. The USA markings will be added to <br />the plans by CONSULTANT design engineers. The Bellecci <br />engineers are required to visit the site frequently to review utilities, <br />especially when the project site is 2.2 miles from Chabot office. <br /> <br />2.3.2. <br /> <br />Prepare Utility Relocation Exhibit -After verification of the utility <br />locations via field survey and mapping acquired from each <br />respective Utility, CONSULTANT will prepare Utility Relocation <br />Plan Base Map. The existing utilities will be shown and identified <br />and new locations identified for relocation. <br /> <br />We will first send request letters to each Utility Company to acquire <br />their design. The letters shall identify what improvement is in <br />conflict with the Preliminary Design, identify that the utilities are <br />within the public right-of-way, and provide tentative schedules for <br />construction timeline. Once notification occurs CONSULTANT will <br />host a meeting with the Utilities and the City to coordinate design <br />and relocation efforts in accordance with the Project Schedule. <br /> <br />Assoc n INC. <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.