My WebLink
|
Help
|
About
|
Sign Out
PC-91-059
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1991
>
PC-91-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 8:38:45 AM
Creation date
6/15/2005 1:35:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/28/1991
DOCUMENT NO
PC-91-59
DOCUMENT NAME
PUD-81-30-52D
NOTES
SIGNATURE PROPERTIES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9. Project identification signage shall be limited to the two <br />monument signs flanking the main project entrance as shown on <br />the site plan. Final sign design, materials, colors, and <br />illumination shall be reviewed and approved by the Planning <br />Director prior to issuance of a building permit. <br /> <br />10. If any historical or archaeological sites or artifacts are <br />uncovered during site grading or utility trenching, all <br />construction activity shall be delayed until an appropriate <br />survey and evaluation of the site is made and/or measures are <br />adopted to protect such resources is made to the satisfaction <br />of the Planning Director. <br /> <br />11. The applicant shall work with the Pleasanton Unified School <br />District and the city Planning Director to develop a program, <br />in addition to the school impact fees required by State law <br />and local ordinance, to off-set this project's long-term <br />effect on school facility needs in Pleasanton. This program <br />shall be designed to fund school facilities to serve new <br />development in Pleasanton. The method and manner for the <br />provision of these funds and/or facilities shall be subject to <br />approval of the City and shall be in place prior to approval <br />of the final map. In no event shall construction of <br />residential units in each project phase commence unless the <br />above method and manner for the provision of these funds <br />and/or facilities has been approved. <br /> <br />12. This development is subject to all Standard Conditions of <br />Development attached hereto and made part of this case by <br />reference except for nos. 7, 12-14, 21, 29, and 33. <br />
The URL can be used to link to this page
Your browser does not support the video tag.