My WebLink
|
Help
|
About
|
Sign Out
PC-91-019
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1991
>
PC-91-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 3:51:26 PM
Creation date
6/8/2005 2:08:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/13/1991
DOCUMENT NO
PC-91-19
DOCUMENT NAME
PUD-90-18
NOTES
SHAPELL INDUSTRIES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />include the fOllowing: <br /> <br />a. A geotechnical evaluation shall be performed on each lot <br />or group of lots with similar subsurface conditions after <br />subdivision grading is completed and prior to issuance of <br />building permits. Corrosivity and expansion potential of <br />the native material and fill shall be evaluated by the <br />geotechnical engineer along with the subsurface <br />conditions observed during grading. The geotechnical <br />engineer shall provide building foundation design, soil <br />preparation, and fine grading recommendations which are <br />appropriate for the on-site soil and geologic conditions <br />observed after subdivision grading is completed. <br /> <br />b. The surface drainage system on each lot shall be designed <br />by a qualified civil engineer and shall be compatible <br />with the subdivision's drainage system. The following <br />items shall be incorporated into each lot's surface <br />drainage system, unless otherwise allowed for custom <br />lots: <br /> <br />All building pads shall be rough graded with a 2% <br />slope. <br /> <br />All roof downspouts shall be connected to a solid <br />pipe collector system which discharges directly to <br />a city storm main or street gutter. <br /> <br />Building pads shall be finished graded with a 2% <br />slope for a minimum of 4' away from the building <br />foundations. site drainage shall be directed <br />toward the street or storm drain system in <br />accordance with section 2907 (d) 5 of the Uniform <br />Building Code. <br /> <br />The crawl space of each house shall be provided <br />with a drainage system which will discharge all <br />water which might enter the crawl space directly to <br />a City storm main or street. <br /> <br />Landscaping and walks shall be installed so that <br />the surface drainage system is not disrupted. <br /> <br />The applicant shall prepare detailed lot drainage <br />requirements and shall include them in the CC&R's <br />for each lot. Specific reference to these <br />requirements shall be made in the deed for each <br />lot. <br /> <br />c. The applicant shall implement the recommendations and <br />plans addressing expansive soils. The soils engineer, <br /> <br />Resolution No. PC-91-19 <br />March 13, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.