Laserfiche WebLink
<br />The project will add housing consistent with the <br />city's growth management plan and to off -set the <br />jobs/housing imbalance which has been projected <br />through rapid commercial/industrial development in <br />north Pleasanton. The grazing use on the Bonde <br />property adds little to the state's existing and <br />future food supply. Development on the site will <br />be contiguous to development on three sides of the <br />site. Lastly, permanent open space has been <br />provided for the City's General Plan, sufficient to <br />provide the physical, social, and(~sthetics assets <br />needed by present and future residents of <br />Pleasanton. Indeed, 55% of the proposed project <br />will remain as significant open space. <br /> <br />The ripeness of the Bonde parcel for development in <br />the late 1980's and early 1990's was not known in <br />1979 and could not have been known at that time. <br />The City's dream of significant commercial/ <br />industrial development in north Pleasanton gained <br />momentum with the approval of a number of business <br />parks in 1981 and 1982, particularly the 573 acre <br />Hacienda Business Park opened in June of 1982. A <br />large increase in local employment throughout the <br />mid eighties led to gradual absorption of <br />previously available residential lands to the point <br />that this parcel is now the logical next density <br />residential classification. <br /> <br />Given the 650 units per year limitation on the <br />number of market rate housing units which can be <br />built pursuant to the Growth Management Plan, <br />development of a logical contiguous site such as <br />the Bonde parcel within the city's developed area <br />is preferable to sites which are further out on the <br />fringe areas of the City further from adequate <br />roads and utilities. <br /> <br />Finally, the payment of the cancellation fee of <br />12.5% of the fair market value will generate <br />government revenues form the Bonde property well in <br />excess of property taxes which would have been <br />recei ved from the property. A portion of the <br />cancellation fees are directed to the Farmlands <br />Mapping Account of the state General Fund and <br />another portion of the cancellation fee is directed <br />to the soil conservation program. <br /> <br />B. There is no proximate noncontracted land which is <br />both available and suitable for the use to which it <br />is proposed the contracted land be put, or, that <br />development of the contracted land would provide <br />more contiguous patterns of urban development than <br />development of proximate noncontracted land. <br />