My WebLink
|
Help
|
About
|
Sign Out
PC 02/23/1994
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
1990-1999
>
1994
>
PC 02/23/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2017 2:34:57 PM
Creation date
6/2/2005 10:54:29 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
2/23/1994
DOCUMENT NAME
PC 02/23/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />In response to Chairman McGuirk, staff stated large boulders will be installed along the sides <br />of the canals and will be covered with soil and hydroseeded. <br /> <br />PUBLIC HEARING WAS OPENED. <br /> <br />Jim McKenzie, 7043 Corte Del Mar, stated his concern for his home, pool, spa and decking <br />being damaged from dust, debris and noise from the construction project. He is also <br />concerned that if the capacity of the canal is reduced, he faces a risk to flooding, in which <br />case he would be required to purchase flood insurance, as well as suffer decreased property <br />value. <br /> <br />PUBLIC HEARING WAS CLOSED. <br /> <br />Chairman McGuirk inquired if the capacity could be reduced in the canal. Mr. Swift and <br />Mr. Hidgon advised the intention of Zone 7 is to keep the capacity the same. Mr. Higdon <br />stated they are taking out some material, and will improve the carrying capacity of the <br />channel. By putting in the boulders, covering with soil and hydroseeding, they will be <br />rebuilt to their original condition. Mr. Higdon stated Zone 7 has ownership of the property <br />and City of Pleasanton has very little control over the construction. He advised the speaker <br />to contact Zone 7 with his concerns. <br /> <br />Mr. Swift advised the City owns the land between the soundwall and the road long the canal <br />bank. Zone 7 would be responsible for any damage to stucco and decking. <br /> <br />A motion was made by Commissioner Hovingh, seconded by Commissioner Wright, <br />rmding the proposed arroyo rehabilitation project is consistent with the Pleasanton <br />General Plan. <br /> <br />ROLL CALL VOTE <br /> <br />AYES: <br />NOES: <br />ABSENT: <br />ABSTAIN: <br /> <br />Commissioners Hovingh, Michelotti, Finch, Wright and Chairman McGuirk <br />None <br />Commissioner Mahern <br />None <br /> <br />Resolution No. PC-94-11 was entered and adopted rmding the proposed arroyo <br />rehabilitation project is consistent with the Pleasanton General Plan. <br /> <br />7. MATTERS INITIATED BY COMMISSION MEMBERS <br /> <br />Commissioner Wright advised the Commission that the walkway along Hopyard between <br />Black and Del Valle Parkway was flooded after the recent rains. Mr. Higdon stated the <br />contractor still has to grade low areas, and this situation will not exist when the project is <br />completed. <br /> <br />Planning Commission Minutes <br /> <br />Page 16 <br /> <br />February 23, 1994 <br /> <br />.. <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.