My WebLink
|
Help
|
About
|
Sign Out
SR 05:123
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2005 9:05:24 AM
Creation date
5/12/2005 8:56:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/17/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:123
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. A disclosure statement indicating the close proximity of the Vineyard Avenue <br /> Corridor Specific Plan area to the Livermore Municipal Airport and of possible <br /> impacts to homes due to aircraft over flights. <br /> <br /> e. A disclosure statement describing the planned use and construction of the old <br /> Vineyard Road right-of-way for public trail uses and disclosing the potential for a <br /> gate to be constructed by the EBRPD at some point along the Vineyard Avenue <br /> Trail. A disclosure stating that the East bay Regional Park District operates <br /> Shadow Cliffs Regional Recreation Area, a regional recreation facility, and that the <br /> buyer recognizes that the activities that take place in the "Regional Recreation <br /> Area" may result in noise, odors, dust, traffic or other conditions that may affect the <br /> lots covered by this PUD Development Plan. A disclosure of the future staging <br /> area and parking area to be owned and operated by the East Bay Regional Park on a <br /> portion of Old Vineyard Avenue right-of-way, and the proposed City Park to be <br /> located on the old landfill site on the south side of Vineyard Avenue. <br /> <br /> f. A disclosure on all lots regarding the underground, 230-kilovolt electrical <br /> transmission line in the right-of-way of new Vineyard Avenue. <br /> <br /> g. A disclosure of the nearby sanitary sewer pump station with standby diesel <br /> generation on new Vineyard Avenue. <br /> <br /> 32. Wording for all disclosures, deed restrictions, and clauses shall be submitted to the City <br /> Attorney for review and approval before City Council approval of the first final <br /> subdivision map for this development and shall be recorded over the project site by <br /> separate instrument. <br /> <br /> 33. This PUD development shall be subject to the permitted and conditional use of the LDR <br /> (Low Density Residential) and Open Space Districts, as provided in the Vineyard Avenue <br /> Corridor Specific Plan. <br /> <br /> 34. This PUD development plan shall be subject to the following site development standards, <br /> as specified in the Vineyard Avenue Corridor Specific Plan: <br /> <br />Site Development Restrictions: <br /> <br /> a. Permitted and Conditionally Permitted Uses are as follows: <br /> I. Permitted Uses: <br /> 1) Single-family detached housing; <br /> 2) Household pets (Limited to four domestic pets total) <br /> 3) Accessory structures and uses, including but not limited to a private <br /> garage, living area without a kitchen, enclosed storage, and recreation <br /> room; <br /> <br />SR:05:123 <br />Page 16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.