Laserfiche WebLink
<br />Resolution No. PC-93-57 <br />Page 6 <br /> <br />22. <br /> <br />All roads on the site are designated as fi <br />roads by the Fire Chief and must be maint <br />with section 2.01 of the Uniform Fire Cod <br />at all times from the start of constructio <br />is completed, Curbs must be painted red or <br />provided as required by the vehicle code. <br /> <br />e apparatus access <br />ined in accordance <br />and be accessible <br />until the project <br />"No Parking" signs <br /> <br />23. The developer shall construct vertical P.C.C. curbs and <br />gutters within this development unless ot erwise approved by <br />the City Engineer. When the sidewalk is a jacent to the curb <br />and gutter, they shall be poured monolithically. <br /> <br />24. The haul route for all materials to and fr m this development <br />shall be approved by the City Engineer pri r to the issuance <br />of an encroachment permit. <br /> <br />25. The developer shall submit an erosion and sedimentation <br />control plan or procedure as part of the 'mprovement plans. <br />Grading completed prior to October 15 shall be revegetated and <br />stabilized by October 15. Grading comple d between October <br />16 and April 15 shall be revegetated and r stabilized as soon <br />as possible after completion of grading. <br /> <br />26. The developer shall submit a dust control p an or procedure as <br />part of the improvement plans. <br /> <br />27. Any damage to existing street improvements uring construction <br />on the subject property shall be repaired 0 the satisfaction <br />of the city Engineer at full expense to th developer. This <br />shall include slurry seal, overlay, or str et reconstruction <br />if deemed warranted by the City Engineer. <br /> <br />28. The developer's contractor(s) shall obta'n an encroachment <br />permit from the city Engineer prior to movi g any construction <br />equipment onto the site. <br /> <br />29. The developer shall comply with the city s non-point storm <br />drain run-off ordinance. <br /> <br />30. <br /> <br />Final inspection by the Planning Departmen <br />to a final building department inspection. <br /> <br />This design review approval will lapse wi <br />the date of approval unless a building pe <br />construction has commenced and is diligen <br />completion or an extension has been appro <br /> <br />required prior <br /> <br />31. <br /> <br /> <br />hin one year from <br />it is issued and <br />ly pursued toward <br />d by the city. <br /> <br />{end} <br />