Laserfiche WebLink
<br />Resolution No. PC-93-49 <br />Page 8 <br /> <br />27. There shall be no individual driveway acces to Foothill Road <br />from any new lot; the Final Map shall refle t this condition. <br /> <br />28. <br /> <br />If a retaining wall is constructed along th <br />40 it shall be private and maintained by t <br />Abatement District. <br /> <br />rear of lots 34 - <br />e Geologic Hazard <br /> <br />29. The applicant shall provide the City with performance bond <br />for all PUD or tentative map required work to be constructed <br />and not accepted as a public improvement; t is shall include, <br />but not limited to perimeter fences, pr vate access road <br />gates, private streets, fire management z ne and other open <br />space landscaping and habitat improvements <br /> <br />30. <br /> <br />Unless otherwise approved by the Fire Marsh <br />Vehicle Access Easements (EVA) shall consis <br />paved roadway plus the AC berm. <br /> <br />11, all Emergency <br />of a 20 foot wide <br /> <br />31. <br /> <br />"B" Court at its intersection with Footh <br />revised such that the new street aligns wit <br />Drive to the satisfaction of the City Engi <br /> <br />11 Road shall be <br />existing Muirwood <br />eer. <br /> <br />32. There shall not be any building constructi n on any lot with <br />over 15 feet of fill until one year afte grading, unless <br />otherwise approved by the Building Officia . <br /> <br />33. The existing condition and capacity of th existing culvert <br />pipes under Foothill Road shall be in estigated by the <br />developers engineer. If determined to be inadequate by the <br />City Engineer, the developer shall replac said culverts. A <br />report of the condition and capacity of th culvert shall be <br />submitted to the city Engineer for approv 1 with the first <br />plan check. <br /> <br /> <br />34. All sanitary sewer mains shall be inter onnected, unless <br />otherwise approved by the city Engineer. <br /> <br />35. <br /> <br />The applicant shall submit a detailed stree <br />the project prior to final map approval. <br />street lights shall be approved by the <br />Planning Director. In general, the street <br />designed to minimize glare off-site. <br /> <br />lighting plan for <br />The design of the <br />i ty Engineer and <br />lighting shall be <br /> <br />36. All public infrastructure improvements an installation of <br />utilities underground shall occur in con 'unction with the <br />Grading and Construction Phasing plans as delineated on the <br />Tentative Map. <br /> <br />37. The developer shall obtain all building <br />City permits for the project prior to <br />construction. <br /> <br />other applicable <br />commencement of <br /> <br />38. The applicant shall comply with the city' <br />storm water run-off ordinance. <br /> <br /> <br />non-point source <br />