My WebLink
|
Help
|
About
|
Sign Out
PC-92-99
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-99
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:34:00 AM
Creation date
5/4/2005 4:49:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/30/1992
DOCUMENT NO
PC-92-99
DOCUMENT NAME
RZ-92-4
NOTES
CITY OF PLEASANTON
NOTES 3
AMEND PMC: INCENTIVES FOR URM AND PUBLIC USE OF PRIVATELY-OWNED OFF-STREET PARKING
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />alter the essential character of the built context. In such , the be&M commission <br />shall delay issuance of the certificate for one hundred eigh days for structures of <br />primary significance and ninety days for structures of seco significance. During <br />the delay period, the be&M commission shall take such acti n as it deems necessary to <br />preserve the structure. Such action may include negotiatio s with civic groups, public <br />or private agencies or individuals for the purchase, lease or relocation of the <br />structure. The 6etIfd commission may also suggest eminen domain proceedings be <br />initiated by the city council. <br /> <br />Chapter 18.88 <br />18.88.020 <br /> <br />Off-Street Parking Facilities. <br /> <br />Basic requirements. <br /> <br />A. (no change) <br />B. (no change) <br />C. (no change) <br />0.1 through 0.2 (no changes) <br /> <br />D.3. As determinlll on a case-by-case basis by the City, e provision of additional <br />off-street parking fadlitUs and/or in-lieu parldng fi es for building <br />expansions exceeding twenty-five percent of the to gross floor ana and/or <br />for proposed new building construction 1IUly be wai III if the property owner <br />allows the existing parking on the property to be op n to the public. <br />Considerations will include access, circulotion, the umber of resulting <br />parking spaces serving the building, the effect on 'acent parldng lots, and <br />whether or not an unreinforclll 11UlSonry (URM) b . g upgrade is <br />involved. . Under this provision, new construction 0 building expansions <br />shall not exceed a bask floor ana. ratio of two hu 'red percent and shall not <br />exceed two-stoms in height. Any property receil'in such a parldng waiver <br />which later meTts to private use would then becom liable to provUh the <br />required parldng and/or in-lieu fee in effect at the . e of the menion to <br />private use. <br /> <br />I. Unreinforced 11UlSonry buildings ofprlnuuy r secondiuy significance <br />which an located on property %Oned C-C within the Downtown <br />Reviwlir,nt/on District boundorles as shown 0 the %Oiling 1IUlpS on file <br />with the city 1IUly be expanded up to a bask or ana ratio of two <br />hundred percent without prol'i4ing any . nal off-street parldng <br />facilities and/or in-lUu parking fees if the b . . g is reinforced to <br /> <br /> <br />E. For property with unreiriforced 11UlSonry (URM) bu <br />section 18.08.407 of this title, the following shall m <br />requirements of subsections A and D of this section <br />
The URL can be used to link to this page
Your browser does not support the video tag.