Laserfiche WebLink
<br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />That all existing wells, septic tanks <br />the site be properly sealed, filled a <br />the start of grading operations unles <br />specific wells for observation wells, <br />is obtained from the City Engineer fo <br />existing well for construction water. <br /> <br />Any wells designated for abandonment <br />encountered during construction, are <br />accordance with a permit obtained fro <br />(415) 484-2600. <br /> <br />That the haul route for all materials <br />development be approved by the City <br />start of any construction. <br /> <br />That the developer submit an erosion <br />control plan or procedure as part of <br />prior to the final approval of the de <br /> <br />That the developer submit a.dust cont <br />as part of the improvement plans prio <br />approval of the development. <br /> <br />or holding tanks on <br />d abandoned prior to <br />Zone 7 retains <br />or special approval <br />temporary use of an <br /> <br /> <br />r any wells <br />o be destroyed in <br />Zone 7 by calling <br /> <br />from this <br />prior to the <br /> <br />nd sedimentation <br />he improvement plans <br />elopment. <br /> <br />01 plan or procedure <br />to the final <br /> <br />22. That storm drainage swales, gutters, 'nlets, outfalls, and <br />channels not within the area of a ded'cated public street <br />or public service easement approved b the City Engineer be <br />privately maintained by the property wners or through an <br />association approved by the city. <br /> <br />23. <br /> <br />24. <br /> <br />That approval of the water supply and <br />be withheld pending final design and <br />has demonstrated to the satisfaction <br />that the proposed system meets both t <br />range requirements for supplying wate <br /> <br />That the developer comply with any an <br />requirements of the cross-connections <br />prevention device programs required b <br />Administrative Code, Title 17. <br /> <br /> <br />distribution system <br />ntil the developer <br />f the City Engineer <br />e immediate and long- <br />in this area. <br /> <br />all applicable <br />control and backflow <br />the California <br /> <br />25. That the developer pay the applicable Zone 7 and city <br />connection fees and the meter cost pr'or to Council <br />approval of the development for any w ter meters <br />(irrigation meters) not directly rela ed to a building <br />permit. <br />