Laserfiche WebLink
<br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />32. <br /> <br />, <br />That approval for the number, type and 1~. cation of fire <br />hydrants be withheld pending final desig , review by the <br />Fire Marshal, and final review by the Ci, y Engineer. <br /> <br />, <br />That approval of the sanitary sewer sYst~m be withheld <br />pending final design and until the devel per has <br />demonstrated to the satisfaction of the ity Engineer that <br />the proposed system is adequate, connectrto an approved <br />point of discharge, and meets both the i ediate and long- <br />range requirements of the sanitary syste in this and all <br />tributary areas. ! <br />! <br /> <br />That if a sanitary sewer lift station is installed for use <br />by the development and if it is accepted by the city for <br />maintenance and operation, an agreement shall be completed <br />between the City and ~he developer prio to the approval of <br />the final map to the effect that the de eloper will provide <br />a maintenance and operation fund for a inimum ten year <br />period. I .... <br />, <br /> <br />That approval of the storm drainage sys em be withheld <br />pending final design and until the developer has <br />demonstrated to the satisfaction of the city Engineer that <br />the system is adequate, connects to an proved point of <br />discharge, meets any and all applicable requirements of the <br />Alameda county Flood Control District - Zone 7, meets any <br />and all applicable requirements:of the ederal Emergency <br />Management Flood Hazard Program, and me ts the immediate <br />and long-range requirements of this dev lopment and all <br />upstream areas intended to be drained t rough this <br />development. <br /> <br />That electric power distribution, gas d'stribution, <br />communication service, and any required alarm systems be <br />installed underground in a joint utilit trench unless <br />otherwise specifically approved by the ity Engineer. <br /> <br />That the developer be responsible for t e installation of <br />the street lighting system serving the evelopment. The <br />street lights shall be 70 watt, high pr ssure sodium vapor <br />units mounted on galvanized steel poles with poured in <br />place bases, on the LS-1C schedule per ity requirements <br />and P.G.&E. standard details unless oth rwise specifically <br />approved. Approval for the number, loc tion, and type of <br />e1ectroliers shall be withheld pending inal design and <br />review by the City Engineer. I <br /> <br />That this development provide a safe an4 effective <br />circulation system for bicycles and ped1strians. These <br /> <br />II <br /> <br />. <br />