Laserfiche WebLink
<br />CULTURAL RESOURCES <br /> <br />IMP ACT lOA: Although no significant archeological resources are known on-site, there is a <br />potential that future earthmoving activities could uncover archaeological materials. FEIR page <br />10-2. <br /> <br />Mitiiation Measure 10-1: Follow stop-work and notification procedures if cultural <br />resources are found during construction. FEIR page 10-2. <br /> <br />Findinl!:: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Finding: If archeological resources are found, they will be handled pursuant <br />to the stop-work and notification procedures of the EIR. This will minimize any potential <br />impacts. <br /> <br />CUMULATIVE TRAFFIC IMPACTS <br /> <br />IMPACTS 13.2A and 13.2B: General Plan buildout will result in congested intersections and <br />freeway bottlenecks in P1easanton. FEIR page 13-2. <br /> <br />Mitil!:ation Measure 13.2-1: Follow mitigations of the EIR for the P1easanton General <br />Plan, including transportation management standards, use of the Downtown Specific Plan <br />to improve levels of service, and other measures. Require the project to pay its pro-rata <br />share of planned street improvements to Bernal Avenue. <br /> <br />Findin~: Changes or alterations have been required in, or incorporated into the project that <br />avoid or substantially lessen the significant effect identified in the Final EIR. However, <br />this impact would not be reduced to an insignificant level. A Statement of Overriding <br />Considerations must be adopted upon approval of the project. <br /> <br />Rationale for Finding: Proposed measures would improve traffic conditions by reducing <br />trips and facilitating traffic flow. However, impacts cannot be fully mitigated. These <br />impacts would occur with or without the Kottinger Hills Project. <br /> <br />CUMULATIVE IMPACT: WATER SUPPLY <br /> <br />IMPACT 13.3A: Ongoing urban development in the area is resulting in a cumulative increase in <br />water demand. FEIR pages 13-4, 13-5. <br /> <br />Miti~ation Measure 13.3-1: The City shall support and coordinate with areawide efforts <br />by other agencies to address cumulative impacts on water supplies. FEIR page 13.3-1. <br /> <br />Findini: Such areawide efforts are within the primary responsibility and jurisdiction of <br />another public agency and not the City of Pleasanton. Such actions can and should be <br /> <br />17 <br /> <br />11 <br /> <br />. <br />