My WebLink
|
Help
|
About
|
Sign Out
PC-92-66
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-66
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:56 AM
Creation date
5/4/2005 2:38:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/22/1992
DOCUMENT NO
PC-92-66
DOCUMENT NAME
PUD-91-13
NOTES
CHANG SU-O LIN
NOTES 3
122 SF HOMES/18-HOLE GOLF COURSE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PUMPING <br /> <br />IMPACT 7.1D: The proposed project could adversely affect pumping facilities, including the <br />Kottinger Hills Pump Station and the Grey Eagle Pump Station. Additional pump capacity is <br />needed to serve the new development. FEIR pages 7-5, 7-6. <br /> <br />Miti~ation Measure 7.1-4: Provide additional pump capacity and modify existing pump <br />stations. FEIR page 7-7. <br /> <br />Findinl!: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Findin~: The modifications required by the mitigation measure will resolve <br />the lack of pump capacity. <br /> <br />PIPING <br /> <br />IMPACT 7.lE. Water piping may have capacity constraints. FEIR page 7-6. <br /> <br />Mitil!ation Measure 7.1-5: Perform a hydraulic analysis and modify piping as needed. <br />FEIR page 7-7. <br /> <br />Findin~: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Findin~: The piping modifications required by this mitigation measure <br />would allow for additional water capacity as needed to serve the new development. <br /> <br />CONSTRUCTION DISRUPTION <br /> <br />IMPACT 7.1F: In order to install needed pipe and make pump modifications, the existing streets <br />in the Grey Eagle subdivision would be disrupted by construction activity. FEIR page 7-6. <br /> <br />Mitigation Measure 7.1-6: Phase construction to minimize disruption of existing streets. <br />Work as quickly as possible. FEIR page 7-8. <br /> <br />Finding: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Finding:: The requirement for phasing will minimize construction disruption <br />in this area. <br /> <br />10 <br /> <br />" . I . <br />
The URL can be used to link to this page
Your browser does not support the video tag.