My WebLink
|
Help
|
About
|
Sign Out
PC-92-66
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-66
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:56 AM
Creation date
5/4/2005 2:38:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/22/1992
DOCUMENT NO
PC-92-66
DOCUMENT NAME
PUD-91-13
NOTES
CHANG SU-O LIN
NOTES 3
122 SF HOMES/18-HOLE GOLF COURSE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DISTURBANCE OF RAPTOR NESTS <br /> <br />IMPACT 6D: Raptors are birds of special interest, under provisions of the Migratory Bird Treaty <br />Act. Construction disturbance which would lead to raptor nest abandonment would constitute an <br />adverse effect of the project. FEIR page 6-17. <br /> <br />Miti~ation Measure 6-4: Avoid construction activities which would result in disturbance <br />to active raptor nests. FEIR page 6-22. <br /> <br />Findine:: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Findine:: The mitigation measure in the EIR would place appropriate <br />restrictions on construction activities near active raptor nests, thus avoiding this impact. <br /> <br />DOMESTIC WATER SUPPLY <br /> <br />IMPACT 7.1B: The proposed storage reservoir will not meet the storage requirement for water <br />in this area. FEIR page 7-5. <br /> <br />Miti~ation Measure 7.1-2: The developer shall construct the reservoir to provide adequate <br />storage. FEIR page 7-7. <br /> <br />Findine:: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Findin~: The requirement for an adequate size of reservoir would assure <br />that adequate water storage would be available in this area. <br /> <br />RESERVOIR ELEVATION <br /> <br />IMPACT 7.1 C: The elevation of the proposed reservoir may result in inadequate water pressure <br />for some homes. FEIR page 7-5. <br /> <br />Mitigation Measure 7-1.3: Place restrictions on homes which could have inadequate water <br />pressure. FEIR page 7-7. <br /> <br />Finding:: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Finding:: Restriction on home elevations will be effective in eliminating <br />concerns due to inadequate water pressure, which is directly related to elevation. <br /> <br />9 <br /> <br />" . I . <br />
The URL can be used to link to this page
Your browser does not support the video tag.