Laserfiche WebLink
documents, and to attend a weekly construction coordination meeting. Services include responding to <br /> Requests For Information, reviewing submittals for sufficiency, and providing clarifying drawings and <br /> specifications. A Field Memorandum for site visits will be provided as needed. <br /> <br /> 3. Pre-maintenance site visit and preparation of a site visit memorandum and punch list outlining <br /> construction deficiencies. <br /> <br /> 4. Final site visit and preparation of a site visit memorandum and punch list outlining construction <br /> deficiencies. <br /> <br /> G. SERVICES NOT PROVIDED <br /> <br /> The following services are not included in the Basic Services to be provided under this Scope of Services: <br /> <br /> 1. Architectural construction documents for Baseball Plaza Architecture, except for Phase One building(s). <br /> 2. Study or presentation models <br /> 3. Digital Simulations <br /> <br /> 4. Revisions to any site plan duc to criteria or program changes that are initiated by Client nfter <br /> Preliminary Design task completion. <br /> <br /> 5. Additional meetings with City Staff or presentations at public heanngs beyond sixteen (16). Consultant <br /> has identified sixteen (16) meetings herein. <br /> <br /> H. ADDITIONAL SERVICES <br /> <br /> Additional services approved in advance by the Client will be billed at Fee Schedule rates as listed in Exhibit *D'. <br /> <br /> I. MISCELLANEOUS PROVISIONS <br /> <br /> The California Board of Architectural Examiners Landscape Architects Program regulates Landscape Architects. <br /> Any questions coneeming a Landscape Architect may be referred to the Board at: <br /> <br /> California Board of Architectural Examiners <br /> Landscape Architects Program <br /> 400 R Street, Suite 4000 <br /> Sacramento, CA 95814 <br /> (916) 4454954 <br /> <br /> Notwithstanding any other term in the Agreement, Landscape Architect shall not control or be responsible for <br /> another party's means, methods, techniques, schedules, sequences or procedures, or for construction safety or any <br /> other related programs. <br /> <br />Bemal Community Park Phase One Sports Fields 9 <br /> <br /> <br />