My WebLink
|
Help
|
About
|
Sign Out
SR 05:112
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2005 10:11:32 AM
Creation date
4/29/2005 8:33:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/3/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Products: The previous design development drawings will be updated and finalized during the <br /> Construction Document Phase. Consultant will provide one formal Construction D~cumentation submittal <br /> (100%) to Client for review and approval (along with Design Development Design (75%) Plan Check sets <br /> returned): <br /> <br /> 1. Civil Engineering Sheets <br /> <br /> 2. Architectural Sheets <br /> <br /> 3. Landscape Architectural Sheets <br /> 4. Electrical Sheets <br /> 5. Structural Sheets <br /> E, FINAL BID DOCUMENTS AND BID ASSISTANCE <br /> <br /> Consultant will provide Bid Documents to assist City in tendering bids for this Project. <br /> <br /> Work Products: The previous 100% Construction Document submittal will be updated and finalized <br /> during the Bid Documents Task. Consultant will provide one formal Bid Document submittal to Client for <br /> City Signature and advertisement (along with Construction Document (100%) Plan Check sets rettuned): <br /> <br /> 1. Final set of Construction Documents (signed) on bond, and in electronic (AutoCad) or digital (PDF) <br /> form. <br /> <br /> 2. Final (pre-bid) bid list, specifications, and analysis of probable construction cost. (engineer's estimate) <br /> <br /> 3. Answer and address bid questions during hid period. <br /> <br /> 4. Provide clarifying drawings, specifications and addenda as necessary during bid period. <br /> <br /> 5. Analyze bid results and recommend strategy for bid award to City Staff. <br /> <br /> 6. It is understood that the ~target~ bid amount for construction of the Phase One Project is approximately <br /> $3.106 Million. Should the Low Base Bid for the Project exceed this target amount by more than 10%, <br /> the Consultant will, at no additional cost l~ the City, expeditiously redesign the Project so that a <br /> subsequent bid will yield a Low Base Bid that meets the target amount within a 10% margin. <br /> <br /> F. CONSTRUCTION OBSERVATION/ADMINISTRATION <br /> <br /> Members of the Consultant Team may perform the following site visits during construction to ensure design <br /> intent. Fees for these services are not included at this time, but may be added. <br /> <br /> 1. Attend preconstruction conference. <br /> <br /> 2. Regular, weekly site visits during construction will be conducted to observe general conformance with <br /> the design intent and general compliance with the information given in the 'For Construction' <br /> <br />Bernal Community Park Phase One Sports Fields 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.