Laserfiche WebLink
<br />seismic Activity <br />Impact: potential for structure damage from seismic activity <br /> <br />The City finds that the project may experience structure damage to <br />dwellings at the site and slope and stream bank failures, due to <br />seismic shaking. This is a potential significant impact (Draft <br />EIR, page 8-17). <br /> <br />proposed Mitigation Measure of the EIR <br /> <br />The EIR identified the following mitigation measure which would <br />substantially avoid this impact. <br /> <br />8-16 Provide earthquake resistant design for buildings, underground <br />utilities and other improvements (Draft EIR, page 8-17). Said <br />mitigation measure was considered and adopted with any <br />pertinent changes in Condition 8-16, Exhibit "B" of the <br />Planning commission staff report dated May 27, 1992. <br /> <br />Finding: Mitigation Measure 8-16 Feasible and Required <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requiring the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigation 8-16 into the project design. The applicant and <br />successors in interest shall incorporate such seismicity impact <br />reduction provisions into project design as a "Condition of <br />Approval" to the project. <br /> <br />Drainage <br />Impact: Downstream flooding and sedimentation <br /> <br />The city finds that the increase in impervious surfaces created by <br />the project may cause downstream flooding and sedimentation. This <br />is a significant impact (Draft EIR, page 8-18). <br /> <br />proposed Mitigation Measure of the EIR <br /> <br />The EIR identified the following mitigation measure which would <br />substantially avoid this impact. <br /> <br />8-17 Implement hydraulic improvements to minimize the effects of <br />increased runoff from project development (Draft EIR, page <br />8-18). Said mitigation measure was considered and adopted <br />with any pertinent changes in Condition 8-17, Exhibit "B" of <br />the Planning Commission staff report dated May 27, 1992. <br /> <br />20 <br /> <br />.. <br /> <br />- <br />