My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7-3 Fire Protection Measures to Reduce Fire Risks (Mitigation <br />Measures 7-3a., b., and c., Draft EIR, page 7-3). said <br />mitigation measures were considered and adopted with any <br />pertinent changes in Condition 7-2(A - C), Exhibit "B" of the <br />planning commission staff report dated May 27, 1992. <br /> <br />Findinq: Mitiqation Measure 7-3 Feasi~le and Required <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requiring the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigation 7-3, as discussed above, into the project design. The <br />applicant and successors in interest shall incorporate such fire <br />protection impact reduction provisions into project design as a <br />"Condition of Approval" to the project. <br /> <br />Parks <br /> <br />Impact: Lack of reasonable access to nearby publio recreation <br />opportunities <br /> <br />The city finds that a fully equipped neighborhood park will not be <br />available to project residents. This is a significant impact <br />regarding lack of reasonable access to nearby public recreation <br />opportunities (Draft EIR, page 7-4). <br /> <br />Proposed Mitigation Measures of the EIR <br /> <br />The EIR identified the following mitigation measure which would <br />substantially avoid this parks impact. <br /> <br />7-4 Contribute to additional neighborhood park facilities (Draft <br />EIR, page 7-4). Said mitigation measure was considered and <br />adopted with any pertinent changes in Condition 7-3, Exhibit <br />"B" of the Planning Commission staff report dated May 27, <br />1992. <br /> <br />Finding: Mitigation Measure 7-4 Feasible and Required <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requiring the applicant and <br />successors in interest to contribute the standard city park fee and <br />provide a public trail and seating area along the creek areas. The <br />applicant and successors in interest shall implement either of the <br />parks impact reduction provisions as a "condition of Approval" to <br />the project. <br /> <br />14 <br /> <br />.. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.