My WebLink
|
Help
|
About
|
Sign Out
SR 05:084
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2005 11:47:09 AM
Creation date
4/14/2005 11:44:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:084
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />The subject project was authorized under the FY 1999/2000 Capital Improvement Program. <br />Ultimately, funding for these improvements will be reimbursed to the City by the Safeway <br />Corporation, as stated in the Cost Reimbursement Agreement between the City of Pleasanton <br />and the Safeway Corporation, dated July 28, 1999. Staff recommends that the interim <br />financing for this project be provided from the General Fund. The Safeway Corporation will <br />be invoiced for reimbursement upon the acceptance of the project by City Council. The <br />project consists of the installation of approximately 6,050 square feet of sidewalk, 9 accessible <br />ramps and landscape improvements. The purpose of this project is to improve pedestrian <br />access with the installation of a new sidewalk where one does not currently exist. <br /> <br />On July 22, 1998, the Planning Commission approved a request by Safeway, Inc. for the <br />expansion of its headquarters. With its approval, the Planning Commission required Safeway <br />to contribute funds towards the design and construction of a public sidewalk located along <br />Stoneridge Mall Road starting from the Safeway site and ending at the existing sidewalk <br />located in front of the Stoneridge Corporate Center. The sidewalk would cross the frontages <br />of three properties including the Wyndam Garden Hotel, an office building owned by Crow <br />Spieker, and the parking area for the future BART station serving the mall area. The <br />Planning Commission's approval also provided for reimbursement to Safeway from these <br />property owners should those properties subdivide or develop within the 15 year life of the <br />agreement. Safeway has reviewed the bids received and has agreed to reimburse the City the <br />costs of improvements once construction is complete. <br /> <br />BIDS <br /> <br />Sealed bids for this project were opened on March 1, 2005. There were a total of six bids, <br />which ranged from $160,500 to $258,665. The engineer's estimate was $161,165. The lowest <br />bid of $160,500 was received from Rosas Brothers Construction. All bid documents submitted <br />by Rosas Brothers Construction were found to be in order. Past work performed by Rosas <br />Brothers Construction was verified to be satisfactory. <br /> <br />BUDGET <br /> <br />Funds <br />Stoneridge Mall Road Sidewalk, <br />Project No. 995020 (Safeway <br />Corporation, Interim: Street CIP <br />General Fund) $211,250 <br /> <br />SR:05:084 <br />Page 2 of 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.