My WebLink
|
Help
|
About
|
Sign Out
PC-95-95
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1995
>
PC-95-95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:27 AM
Creation date
4/13/2005 4:22:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/29/1995
DOCUMENT NO
PC-95-95
DOCUMENT NAME
PUD-95-06
NOTES
RED BEAR INC.
NOTES 3
GPA/REZONE 5 PARCELS FROM LDR TO HDR; 97-UNIT SENIOR APARTMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-95-95 <br />Page l3 <br /> <br />Construction Activities <br /> <br />32. All site improvements and house construction activities shall <br />be limited to the hours of 8:00 a.m. to 5:00 p.m., Monday <br />through Saturday. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall <br />be equipped with muffling devices. <br /> <br />33. At no time shall campers, trailers, motor homes, or any other <br />vehicle be used as living or sleeping quarters on the <br />construction site. All such vehicles shall be removed from <br />the site at the end of each work day. <br /> <br />34. Portable toilets used during construction shall be kept as far <br />as possible from existing residences and shall be emptied on <br />a regular basis as necessary to prevent odor. <br /> <br />35. The site shall be kept free of fire hazards from the start of <br />construction to final inspection. <br /> <br />BUILDING DEPARTMENT CONDITIONS <br /> <br />36. All building and/or structural plans must comply with all <br />codes and ordinances in effect before the Building Department <br />will issue permits. <br /> <br />37. All dwelling units in the development shall be constructed to <br />meet Title 24 state energy requirements. <br /> <br />38. The developer shall submit two copies of the site soils report <br />to the Director of Building Inspection for third party peer <br />review and shall pay for such review at the time specified by <br />the Director, but in all cases before the issuance of a <br />grading permit. <br /> <br />39. A sanitary sewer sampling manhole shall be provided on each of <br />the sanitary sewer lateral from each building, unless <br />otherwise waived by the Director of Building Inspection. <br /> <br />40. Prior to issuance of a building permit, the developer shall <br />pay the applicable Zone 7 and City connection fees and water <br />meter cost for any water meters, including irrigation meters. <br />Additionally, the developer shall pay any applicable Dublin <br />San Ramon Services District (DSRSD) sewer permit fee. <br /> <br />41. The developer shall pay any and all fees to which the property <br />may be subject prior to the issuance of building permits, <br />unless otherwise waived by the City Council. The type and <br />amount of the fees shall be those in effect at the time the <br />building permit is issued. <br /> <br />" <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.