Laserfiche WebLink
<br />Resolution No. PC-95-95 <br />Page l2 <br /> <br />28. The developer shall effectively screen from view all ducts, <br />meters, air conditioning equipment, and any other mechanical <br />equipment, whether on the structure, on the ground, or on the <br />roof, with materials architecturally compatible with the main <br />structure. Screening details shall be shown on the plans <br />submitted for issuance of building permits, the adequacy of <br />which shall be determined by the Planning Director. All <br />required screening shall be provided prior to occupancy. <br /> <br />29. The location of any pad mounted transformers shall be subject <br />to approval by the Planning Director prior to issuance of <br />permits by the Building Department. Such transformers shall <br />be screened by landscaping or contained within an enclosure <br />matching the building and with corrugated metal gates. All <br />transformers shall be shown on the plans submitted for <br />issuance of building permits. The developer shall attempt to <br />locate transformers at the rear of the site. <br /> <br />30. All backflow prevention devices installed with the development <br />shall be painted forest green (Pantone Color System Number <br />2030) and shall be screened from view from publici private <br />streets. Screens shall consist of berms, walls, or <br />landscaping satisfactorily integrated into the landscape plan. <br />Landscape screens shall include shrubbery designed by species <br />and planting density to establish a complete screen within one <br />year from the date of planting. Weather protection devices <br />such as measures to protect pipes from freezing shall require <br />approval by the Planning Director prior to use; at no time <br />shall fabric or other material not designed and/ or intended <br />for this purpose be wrapped around or otherwise placed on <br />these devices. All backflow prevention devices shall be shown <br />on the plans submitted for issuance of building permits <br />together with screening mechanism and/ or weather protection <br />devices. Proposed screening and weather protection devices <br />shall be reviewed for conformity to these requirements and <br />approved by the Planning Director prior to issuance of a <br />building permit. <br /> <br />31. All trash and refuse shall be contained completely within <br />enclosures architecturally compatible with the main structure. <br />The materials and color of the enclosure walls shall match the <br />building walls and the gates shall be corrugated metal or <br />solid wood. The location and design of the enclosures shall <br />be shown on the plans submitted for issuance of building <br />permits, shall be consistent with Condition #46, and shall be <br />subj ect to the approval of the Planning Director and Fire <br />Chief. Trash containers shall be stored within the enclosure <br />at all times, except when being unloaded. <br /> <br />. [ <br /> <br />.. <br />