Laserfiche WebLink
<br />74. The haul route for all materials to and from this development shall be approved by the City <br />Engineer prior to the issuance of an encroachment permit <br /> <br />75. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department <br />Such measures shall be maintained until such time as permanent landscaping is in place <br /> <br />76. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />77. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br />dedicated public street or public service easement approved by the City Engineer shall be <br />privately maintained by the propelly owners or through an association approved by the <br />City. <br /> <br />78. The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Engineer <br /> <br />79. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this development <br />and all upstream areas intended to be drained through this development <br /> <br />80. Electric power distribution, gas distribution, communication service, Cable television, and <br />any required alarm systems shall be installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer or Director of Building Inspection <br />for on-site <br /> <br />81. The applicant shall be responsible for the installation of the street lighting system serving <br />the development The street lights shall be 70 watt, high pressure sodium vapor units <br />mounted on galvanized steel poles with poured in place bases, on the LS-I C schedule per <br />City requirements and PG&E standard details, unless otherwise specifically approved. <br />Approval for the number, location. and type of electroliers shall be subject to the review <br />and approval of the City Engineer <br /> <br />CONDITIONS OF APPROVAL <br /> <br />PUD-95-03 <br /> <br />PAGE II <br />