Laserfiche WebLink
<br />Resolution No. PC-95-64 <br />Page 5 <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste <br />from the street pavement and storm drains adjoining the <br />site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. <br />Broom sweep the street pavement adjoining the project <br />site on a daily basis. Scrape caked-on mud and dirt from <br />these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter <br />fabric, etc.) at the storm drain inlet nearest the <br />downstream side of the project site in order to retain <br />any debris or dirt flowing in the storm drain system. <br />Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the <br />storage of bags, cement, paints, oils, fertilizers, <br />pesticides, or other materials used on the site that have <br />the potential of being discharged into the storm drain <br />system through being windblown or in the event of a <br />material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or <br />rinse containers into a street, gutter, or storm drain. <br />Ensure that concrete/gunite supply trucks or <br />concrete/plaster operations do not discharge wash water <br />into street, gutters, or storm drains. <br />