Laserfiche WebLink
<br />21. The house shall be constructed to meet Title 24 State energy requirements. <br /> <br />22. The applicant shall include erosion control measures on the final grading plan. The <br />applicant is responsible for ensuring that the contractor is aware of such measures. All <br />cut and fill slopes shall be revegetated and/or stabilized as soon as possible after <br />completion of grading, or by October 15, whichever occurs first. If permanent <br />landscaping is not in place by October 15, no grading shall occur unless approved erosion <br />control measures are to the satisfaction of the Building Department. Such measures shall <br />be maintained by the owner until such time as permanent landscaping is established. <br /> <br />23. No construction materials shall be stored within public rights-of-way. <br /> <br />24. If the rim elevation of the upstream public sanitary sewer is at an elevation higher than <br />that of the lowest portion of the building pad, a back-flow prevention device (check <br />valve) shall be installed on the lateral between the house and public sanitary sewer line. <br /> <br />25. Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />26. The applicant shall submit a pad elevation certification prepared by a licensed land <br />surveyor or registered civil engineer, to the Chief Building Official and Planning <br />Director, certifying that the pad and building locations are per approved plans, prior to <br />receiving a foundation inspection for the structure. <br /> <br />27. Dust and mud shall be contained within the boundaries of the property during times of <br />construction. <br /> <br />28. The home shall be constructed with Class A fire retardant roofing material to the <br />satisfaction of the Fire Marshall. <br /> <br />29. All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday. All construction equipment must meet <br />DMV noise standards and shall be equipped with muffling devices. <br /> <br />30. Pool fencing shall be installed pursuant to the Pleasanton Municipal Code requirements. <br />This fencing shall be shown on the plans submitted for building permit issuance and shall <br />be subject to the review and approval of the Chief Building Official. <br /> <br />31. At no time shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed from the <br />site at the end of each work day. <br /> <br />August 23, 1995 <br /> <br />CONDITIONS OF APPROV AL-Z-94-252 <br /> <br />PAGE 4 <br />