My WebLink
|
Help
|
About
|
Sign Out
PC-95-55
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1995
>
PC-95-55
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:23 AM
Creation date
4/8/2005 3:06:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/9/1995
DOCUMENT NO
PC-95-55
DOCUMENT NAME
VTTM 6779
NOTES
RUBY HILL JOINT VENTURE INC.
NOTES 3
SUBDIVIDE INTO 147 LOTS PER RUBY HILL II AND TRACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-95-55 <br />Page 22 <br /> <br />~ Urban Clean Water Run-Off <br /> <br />97. The applicant shall submit a construction Best Management <br />Practices (BMP's) program for review and approval by the <br />Planning Director prior to issuance of building and/or grading <br />permits. These BMP's shall be implemented by the general <br />contractor and all subcontractors and suppliers of materials <br />and equipment. Construction site cleanup and control of <br />construction debris shall also be addressed. Failure to <br />comply with the approved construction BMP may result in the <br />issuance of correction notices, citations, or a stop work <br />order. <br /> <br />The applicant is responsible for implementing the following <br />measures during all construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and <br />place it in a dumpster or other container which is <br />emptied or removed an a weekly basis. When appropriate, <br />use tarps on the ground to collect fallen debris or <br />splatters that could contribute to storm water runoff <br />pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste <br />from the street pavement and storm drains adjoining the <br />site. Limit construction access routes onto the site and <br />place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. <br />Broom sweep the street pavement adjoining the project <br />site on a daily basis. Scrape caked-on mud and dirt from <br />these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter <br />fabric, etc. ) at the storm drain inlet nearest the <br />downstream side of the project site in order to retain <br />any debris or dirt flowing in the storm drain system. <br />Maintain and/or replace filter materials to ensure <br />effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the <br />storage of bags, cement, paints, oils, fertilizers, <br />pesticides, or other materials used on the site that have <br />the potential of being discharged into the storm drain <br />system through being windblown or in the event of a <br />material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or <br />rinse containers into a street, gutter, or storm drain. <br />Ensure that concrete/gunite supply trucks or <br />concrete/plaster operations do not discharge wash water <br />into street, gutters, or storm drains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.