My WebLink
|
Help
|
About
|
Sign Out
PC-2004-58
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2004
>
PC-2004-58
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:33 AM
Creation date
3/23/2005 3:34:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/22/2004
DOCUMENT NO
PC-2004-58
DOCUMENT NAME
PDR-289
NOTES
FAIRLAND INVESTMENT
NOTES 3
CONSTRUCT GAS STATION, CARWASH AND CONVENIENCE MARKET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />71. The car wash shall drain through an oil/water separator to the sanitary sewer, subject to <br />approval by DSRSD, or collected in a holding tank for removal by a disposal and <br />recycling service. No other area of the project site shall drain to the car wash area; a berm <br />shall be installed to prevent such drainage if found necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />72. The project developer shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. On-site storm <br />drain facilities shall be cleaned a minimum of twice a year as follows: immediately prior <br />to October 15 and once in January. Additional cleaning may be required iffound <br />necessary by the City Engineer/Director of Building Inspection. <br /> <br />73. The project developer shall include erosion control/storm water quality measures on the <br />final grading plan which shall specifically address measures to prevent soil, dirt, and <br />debris from entering the storm drain system. Such measures may include, but are not <br />limited to, hydro seeding, hay bales, sandbags, and siltation fences and are subject to the <br />review and approval of the City Engineer/Director of Building Inspection. If no grading <br />plan is required, necessary erosion control/storm water quality measures shall be shown <br />on the site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The project developer is responsible for ensuring that <br />the contractor is aware of and implements such measures. <br /> <br />74. No grading shall occur between October 15 and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of the Director <br />of Building Inspection. Such measures shall be maintained until such time as permanent <br />landscaping is place. <br /> <br />75. The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />76. The project developer is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining <br />the project site on a daily basis. Scrape caked-on mud and dirt from these areas <br />before sweeping. <br /> <br />10 <br /> <br />III . <br />
The URL can be used to link to this page
Your browser does not support the video tag.