My WebLink
|
Help
|
About
|
Sign Out
PC-2004-29
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2004
>
PC-2004-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:31 AM
Creation date
3/16/2005 3:11:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/28/2004
DOCUMENT NO
PC-2004-29
DOCUMENT NAME
PUD-28
NOTES
REGIS LACHANCE
NOTES 3
TO REZONE 12,400 SQ. FT PARCEL INTO TWO LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e. The necessary fees. <br /> <br />51. All dwelling units in the development shall be constructed to meet Title 24 state energy <br />requirements. <br /> <br />52. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />53. The project developer shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasant on. These plans shall be approved by the Chief Building <br />Official prior to the issuance of a building permit. The site development plan shall <br />include all required information to design and construct site, grading, paving, drainage, <br />and utilities. Specific items to be indicated on the site development plan necessary to <br />construct the improvements are to be in accordance with the City of Pleasanton Private <br />Development Design Guidelines adopted April 15, 1986. <br /> <br />54. The project developer shall submit plot plans for each of the residential lots showing <br />building setbacks and a topographic plan showing grading and drainage. Pad elevations, <br />finish floor elevations, retaining walls, easements, and maximum height ofthe highest <br />structure are to be indicated on the plan. Plans for custom lots are to be signed by a <br />registered civil engineer. All residential plot plans shall show compliance with 2907( d) <br />and 70012(d) ofthe Uniform Building Code. <br /> <br />55. The project developer shall submit two copies of the site soils report to the Chief <br />Building Official for third party peer review and shall pay for such review at the time <br />specified by the Director, but in all cases before the issuance of a grading permit. <br /> <br />56. The soils engineer shall certify the pad compactions of all lots containing fill to the <br />satisfaction of the Chief Building Official prior to the issuance of building permits. <br /> <br />57. Building and situs plans are to be submitted to the Building Department on computer disk <br />in a format approved by the Director. Digitized information shall be submitted before <br />requesting a final inspection and should reflect as-built situs and architectural information <br />as approved by the Director. <br /> <br />Construction Requirements: <br /> <br />58. All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday, except no construction shall occur on <br />Federal Holidays. All construction equipment must meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.