My WebLink
|
Help
|
About
|
Sign Out
SR 05:069A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:069A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2005 1:59:43 PM
Creation date
3/10/2005 1:00:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:069A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />I1. <br /> <br />12. <br /> <br />The east side of Lot #3 shall be treated as the front yard with a 20 <br />foot setback and the west side of Lot #3 shall be treated as the rear <br />yard with a 20 foot setback. A revised development plan showing <br />the changed setbacks shall be submitted to the Planning Director for <br />review and approval in conjunction with the parcel map application. <br />During the design review process for the home on this lot, the <br />Planning Director may approve minor variations in the required <br />setbacks. <br /> <br />Prior to recordation of any parcel map, a separate deed instrument for the <br />easements on the Bach property shall be completed and submitted to the City <br />Attorney for review and approval. The easements on the Bach property shall be <br />recorded prior to the recordation of the parcel map. <br /> <br />Prior to final parcel map approval and recordation a disclosure notice shall be <br />submitted to the City Attorney and Planning Director for review and approval <br />informing all future property ownem of the future trail connection to San Carlos <br />Way. <br /> <br />The construction of the pedestrian path on the Bach property shall be the <br />responsibility of the developer of the Bach property. The exact location and <br />timing for the installation of the path shall be determined in conjunction with the <br />Bach PUD application. <br /> <br /> The sidewalk on the east side of the shared driveway on Lots #2 and #3 shall be <br /> installed in conjunction with the subdivision improvements for this development. <br /> The improvement plans submitted in conjunction with the parcel map shall detail <br /> these improvements and shall be subject to review and approval of the City <br /> Engineer. <br /> <br /> Prior to recordation of the final parcel map, all required fees applicable to this <br /> property contained in the North Sycamore Specific Plan Finance Plan shall be <br /> paid. Lot #2 shall not be required to pay the NSSP Finance Plan fees unless it is <br /> rebuilt or demolished pursuant to the Finance Plan. Any such fees shall be paid <br /> prior to issuance ora building permit for a remodel/addition or a new home. <br /> In conjunction with any parcel map application, the relocation of the private <br /> driveway around trees #152 and #159 shall be explored in an effort to preserve this <br /> tree. <br /> <br />-PUD-99-02 <br /> <br />City Council - Conditions of Approval <br /> <br />Page 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.