My WebLink
|
Help
|
About
|
Sign Out
SR 05:069A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:069A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2005 1:59:43 PM
Creation date
3/10/2005 1:00:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:069A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
72. <br /> <br />73. <br /> <br />74. <br /> <br />75. <br /> <br />76. <br /> <br />77. <br /> <br />The pro~ect developer shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. On-site storm <br />drain facilities shall be cleaned a minimum of twice a year as follows: immediately prior <br />to October 15 and once in January. Additional cleaning may be required if found neces- <br />sary by the City Engineer. <br /> <br />Bulk construction materials stored outdoors that may contribute to the pollution of storm <br />water runoff shall be covered as deemed appropriate by the City Engineer and/or the Di- <br />rector of Building Inspection. <br /> <br />Prior to the commencement of any clearing, grading, or excavation, the project developer <br />shall submit a copy of the State Water Resources Control Board Notice of Intent (NOI) for <br />coverage under the State Construction Storm Water General Permit. <br /> <br />All cut and fill slopes shall be revegetated and stabilized after completion of grading, but <br />in no case later than October 15. Hydroseeding shall be accomplished before September <br />15 and in'igated with a temporary irrigation system to ensure that the grasses are estab- <br />lished before October 15. No grading shall occur between October 15 and April 15 unless <br />approved erosion control/storm water quality measures are in place, subject to the ap- <br />proval of the City Engineer and/or the Director of Building Inspection. Such measures <br />shall be maintained until such time as permanent landscaping is place. <br /> <br />The project developer shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of building <br />and/or grading permits. These BMP's shall be implemented by the general contractor and <br />all subcontractors and suppliers of materials and equipment. Construction site cleanup <br />and control of construction debris shall also be addressed. Failure to comply with the ap- <br />proved construction BMP may result in the issuance of correction notices, citations, or a <br />stop work order. <br /> <br />The project developer is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to <br />storm water runoff pollution. <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or grav- <br />eled areas during wet weather. Broom sweep the street pavement adjoining the pro- <br /> <br />SR 05.'069 <br />Page 13 of 14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.