My WebLink
|
Help
|
About
|
Sign Out
PC-96-79
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1996
>
PC-96-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:16 AM
Creation date
3/2/2005 2:03:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/23/1996
DOCUMENT NO
PC-96-79
DOCUMENT NAME
PUD-85-08-9D
NOTES
RED ROBIN RESTAURANT
NOTES 3
RESTAURANT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-96-79 <br />Page 11 <br /> <br />64. The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining <br />the project site on a daily basis. Scrape caked-on mud and dirt from these areas <br />before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt <br />flowing in the storm drain system. Maintain and/or replace filter materials to <br />ensure effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br />potential of being discharged into the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br />concrete/plaster operations do not discharge wash water into street, gutters, or <br />storm drains. <br /> <br />{end} <br />
The URL can be used to link to this page
Your browser does not support the video tag.